PB13-5 — Utility Encroachment Application Procedures
Minneapolis Code of Ordinances (Supp. No. 73, Update 1: codified through Ordinance No. 2026-020, adopted June 25, 2026) · Minneapolis Park and Recreation Board Code of Ordinances § PB13-5
Corpus is an independent public-information project, not the official City of Minneapolis website. Stable reference: corpuslaw.us/code/c2ed00cd-55d8-4a10-ae8f-6ecba3c4287e
PB13-5. - Utility Encroachment Application Procedures.
PB13-5-1. Application. A written application for a utility encroachment approval, along with the proposed utility alignment plan, shall be filed with the Parks Engineer and shall include a statement indicating the grounds upon which the approval is requested, and give reasons why the proposed alignment is the only feasible alternative. Three sets of clearly legible blue or black lined copies of all drawings on bond paper are required. Required information as outlined in Section 13-5-2 shall be submitted to the Parks Engineer and shall be accompanied by a receipt from the Special Services Department evidencing the payment of all required fees for processing and approval as set forth in Section 13-8 of this chapter. The utility alignment plan drawings shall be prepared to a scale appropriate to the site of the project and suitable for the review to be performed. At a minimum the scale shall be one (1) inch equals fifty (50) feet. Drawing sheets shall be on eleven (11) by seventeen (17) inch sheets. PB13-5-2. Utility alignment plan and as-built drawing. At a minimum the utility alignment plan and post construction as-built drawing shall contain the following: A map of existing site conditions showing the site and immediately adjacent areas within one hundred (100) feet, and including: (a) The names, addresses, telephone numbers, and fax numbers of: the applicant, owner, engineer and contact person. (b) A north point oriented either up or to the right, date and scale of drawing and number of sheets. (c) Property parcel lines. (d) Information regarding the names and numbers of adjoining roads, railroads, utilities, subdivisions, towns and districts or other landmarks. (e) Location and indication of existing structures, fences, sidewalks, roadways, lights of other park equipment. (f) Location and indication of demolition, relocation, or abandonment of existing structures. (g) Existing underground and overhead utilities, easements and rights-of-way. (h) A delineation of all streams, rivers, ponds, public waters and wetlands. (i) Vegetative cover such as brush, grass and trees, and clearly delineating any vegetation proposed for removal. (j) The proposed, or as-built utility alignment, location and elevations, and identification of infrastructure including junction boxes manholes or other installed equipment. (k) Locations and dimensions of all construction-site erosion control measures. (l) Schedule of anticipated starting and completion date of each land disturbing activity. (m) Any other information pertinent to the project, which in the opinion of the applicant or the Parks Engineer is necessary for the review of the project. (Pk. Bd. Ord. No. 2002-101, § 1, 6-12-02)
Ask a question about Minneapolis law
Corpus searches the Minneapolis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
