§ 3 — Location, other regulations

Minneapolis Code of Ordinances (Supp. No. 73, Update 1: codified through Ordinance No. 2026-020, adopted June 25, 2026) · Minneapolis Code of Ordinances, App. D-1, § 3

Corpus is an independent public-information project, not the official City of Minneapolis website. Stable reference: corpuslaw.us/code/75a40ae7-8c9f-4b80-8896-481fd909dcbe

Section 3. - Location, other regulations.

3.1. Location of Facilities. Electric Facilities shall be located, constructed, and maintained in accordance with the operating requirements set forth by the Commission and best industry practices so as to not unreasonably: (1) Interfere with the safety and convenience of ordinary travel along and over Public Way or; (2) Interfere with the public or governmental use of the Public Way; (3) Interfere with the public or governmental use of Public Grounds; or (4) Disrupt normal operation of any City Utility System. Subject to the terms of any particular right-of-way permit, Company shall ensure that Electric Facilities are located or relocated, when initially constructed, in compliance with Titles II and III of the Americans with Disabilities Act of 1990 ("ADA") and associated regulations, 28 CFR Part 35, as required by the terms of any particular right of way permit and in a manner that presents no temporary or permanent interference with any established Pedestrian Access Route (as defined by the ADA) in the Public Way. Electric Facilities shall be located on Public Grounds as determined by the City. The Company's construction, reconstruction, operation, repair, maintenance, and location of Electric Facilities shall be subject to permits as required by the Minneapolis Code of Ordinances, including but not limited to Chapters 429 and 430, as may be amended from time to time, and to such other reasonable regulations of the City consistent with authority granted the City to manage its Public Way and Public Ground under state law. 3.2. Field Locations and Mapping. Company shall provide field locations for its underground Electric Facilities within City consistent with the requirements of Minnesota Statutes, Chapter 216D. In addition, upon written request by City, Company must promptly provide complete and accurate mapping information for Electric Facilities in accordance with the requirements of Minnesota Rules 7819.4000 and 7819.4100. The City shall specify the locations for which such mapping information is requested, and, to the extent possible, treat all infrastructure information shared by the Company as proprietary, confidential, and non-public data pursuant to the Minnesota Data Practices Act and applicable federal law. 3.3. Street Openings. Subject to Sections 3.1 and 3.4, the Company, or its authorized subcontractor, shall not open or disturb any Public Ground or Public Way for any purpose (the "Work") without first having obtained the required permits from the City, for which the City may impose a fee. In performing the Work, the Company shall obtain any required lane use, obstruction, and/or sidewalk inspection permit or lane use permit required under Minneapolis Code of Ordinances Chapter 430, for which the City may impose a fee. Failure of the Company or its authorized subcontractor to comply with the terms of the obstruction, lane use, and/or sidewalk inspection permit, which are directly attributable to the Company or its authorized subcontractor, and over which the Company or its authorized subcontractor has control, shall result in the imposition of a proportional charge of the permit fee as appropriate for the circumstance. This Section 3.3 does not apply to work for routine maintenance, storm restoration or tree trimming purposes. During the progress of the Work, the Company shall post signage identifying the Work as performed on behalf of the Company. 3.4. Emergencies. The requirements for obtaining permits from the City pursuant to Section 3.3 shall not apply when an emergency exists requiring the immediate repair of Electric Facilities. In an emergency, the Company shall notify the City by telephone and email to the office designated by the City before, if reasonably possible, commencing the emergency repair, but in any event as soon as practicable. Within two (2) business days after commencing the repair, the Company shall obtain any required permits and pay any required fees. 3.5. Restoration. After performing the Work, the Company shall, as promptly as weather permits, restore the Public Way in accordance with Minnesota Rules, Part 7819.1100, and applicable City ordinances to the extent consistent with law. The Company shall restore the Public Ground to as good a condition as formerly existed, remove all direct, rubbish, equipment and shall maintain any paved surface in good condition for two (2) years thereafter (the "Restoration Work"). If the Company fails to promptly, as weather permits, complete the Restoration Work, then the City shall, after demand to the Company to cure and the passage of a reasonable period of time following the demand, not to exceed five days, have the right to perform or arrange the Restoration Work at the expense of the Company, including the City's administrative expenses and overhead. 3.6. Avoidance of Damage. The Company shall determine and implement reasonable measures to prevent the Electric Facilities from causing damage to persons or property. The Company shall determine and implement reasonable measures to protect the Electric Facilities from damage that could be inflicted on the Electric Facilities by persons, property, or the elements. The Company and the City must take protective measures consistent with State Statutes 216D.05 to avoid damage to and minimize interference with underground facilities when excavating or performing work. The Company shall be responsible for removal of graffiti from Electric Facilities. The Company shall provide notice to the City in the event that any City Utility System is damaged in performing the Work or Restoration Work. 3.7. Coordination of Company Projects and Public Improvements. (a) For purposes of coordination of City projects and Company projects within the City, the City and Company shall meet at least once annually, on or before April 1 of each calendar year of this Franchise, to review the City's CIP and the Company's Major Projects. (b) Definitions. For the purposes of this section only, the following terms shall have the meanings given. CIP means the City's five-year capital improvement plan. Major Projects means the Company-initiated projects forecasted to take place in the City in the next twenty-four (24) months occurring within the City right-of-way impacting more than seven hundred fifty (750) lineal feet of Electric Facilities. (c) The parties recognize that the City's CIP and Company's Major Projects are subject to change depending on weather, funding, labor, and other issues. Each party agrees to promptly inform the other of any changes to the CIP or Major Projects that may impact the other party. To the greatest extent permitted at law, the City shall treat any data the Company deems sensitive, confidential, proprietary, or critical energy infrastructure as "security information" not subject to public disclosure under the Minnesota Government Data Practices Act, Minnesota Statutes, Chapter 13. (d) Either party may, from time to time, request a meeting among appropriate representatives for purposes of discussing coordination of improvement projects or work, and both parties hereby agree to reasonably accommodate such meeting requests. (e) The City must give the Company reasonable notice of plans for improvements to Public Grounds or Public Way when the City has reason to believe that Electric Facilities may affect or be affected by the improvement. The notice must contain, if known: (1) The nature and character of the improvements, (2) The Public Ground and Public Way upon which the improvements are to be made, (3) The extent of the improvements, (4) The time when the City anticipates the start of work, and (5) If more than one Public Ground or Public Way is involved, the order in which the work is expected to proceed. In an emergency situation, the City shall notify the Company by telephone and email to the representative designated by the Company before, if reasonably possible, commencing the emergency work, but in any event as soon as practicable. 3.8. Use of Poles. The Company shall make space available on its poles or towers for City fire, water utility, police or other City facilities upon terms and conditions mutually acceptable to the parties whenever such use will not interfere with the use of such poles or towers by Company, by another electric utility, by a telephone utility, or by any cable television company or other form of communication company. In addition, the City shall pay for any added cost incurred by the Company because of such use by the City. 3.9. Compliance with Laws. In its operations under this Ordinance, the Company shall observe all applicable federal, state, and local laws, rules, regulations, and orders with respect to the transmission, distribution, transformation, or furnishing of electric energy. The Company shall not release, spill, or dispose in the Public Way or Public Ground or permit to be released, spilled or disposed in the Public Way or Public Ground, any materials, substances, and wastes regulated as toxic or hazardous to health, natural resources, or the environment by the State of Minnesota, the United States, or any other applicable government authority with jurisdiction ("Hazardous Materials"). In the event the Company releases, spills, or disposes Hazardous Materials in the Public Way or Public Ground, the Company shall comply with all applicable laws, regulations, and lawful governmental orders of federal, state, and local governmental agencies related to such Hazardous Materials. The Company shall remove or remediate any Hazardous Materials caused or permitted by the Company to be released, spilled, or disposed on, in, or immediately adjacent to the Public Way and Public Ground within the City in compliance with all applicable laws, regulations, and lawful governmental orders, and pay or cause to be paid all costs associated therewith, but the Company shall not be responsible for removing or remediating any pre-existing Hazardous Materials encountered in the Public Way or Public Ground within the City. The indemnification terms and conditions of Section 6 shall apply to all claims made against City by any person, including any governmental agency, who or which asserts any right to costs, damages, or other relief which arise solely or directly from the Company's negligent acts or failure to act in compliance with any law, rule, regulation, or lawful order governing Hazardous Materials.

Ask a question about Minneapolis law

Corpus searches the Minneapolis sections it holds and shows the ones that match, with their citations. Free, no sign-in.