§ 511.260 — Time extension

Minneapolis Code of Ordinances (Supp. No. 73, Update 1: codified through Ordinance No. 2026-020, adopted June 25, 2026) · Minneapolis Code of Ordinances § 511.260

Corpus is an independent public-information project, not the official City of Minneapolis website. Stable reference: corpuslaw.us/code/f8f6f663-8130-4c21-a7e3-96b507173951

511.260. - Time extension.

(a) Time extension for compliance. An owner may request a time extension to comply with a notification to disconnect. A time extension for one (1), two (2) or three (3) years may be requested and renewed prior to expiration as provided for in subsection (d). A request for a time extension must be submitted on a form provided by the city engineer or city engineer's designee with payment of a filing fee in an amount set by resolution. (b) Time extension approval. A request for a time extension will be approved upon payment of a time extension fee in an amount set by resolution, and only in those cases in which the facts presented to the city engineer or city engineer's designee demonstrate to the reasonable satisfaction and professional judgment of the city engineer or city engineer's designee that timely disconnection would not be safe, prudent, or feasible and that a delay in disconnection is consistent with plans for the area's public infrastructure. For example, a disconnection that when performed would pose an increased risk to public health, or a disconnection that when performed would contribute to localized flooding would not be safe, prudent, or feasible. A time extension shall not be for a period longer than the period necessary to reasonably plan for and achieve compliance consistent with plans for the area's public infrastructure and keeping in mind the city's overriding interest in limiting inflow of stormwater into the city's sanitary sewer system to prevent the possibility of sewage backing up into homes and businesses, and prevent discharge of raw sewage into the Mississippi River. (c) Conditions of a time extension granted. If a time extension is granted, the city engineer or city engineer's designee reserves the right to require minimization of the continued inflow, prohibit expansion of the inflow and impose other reasonable conditions based upon the facts in each case. The time extension may be reopened to require additional work if previously undisclosed or unknown information or changing regulatory requirements or other conditions makes additional work necessary. The fee for a time extension issued to buildings or premises shall be calculated by the city engineer or city engineer's designee based on the following formula: The current sewer utility rate multiplied by the square footage of the area contributing rainwater to the sanitary sewer system multiplied by the average annual rainfall, in feet, in the Minneapolis/St. Paul area for the prior ten (10) years, for example, from 2008 to 2017 as determined by the National Oceanic and Atmospheric Administration (NOAA) National Centers for Environmental Information (31.40 inches = 2.62 feet). Sample calculation: Current sewer rate in 2018 was $3.88 per unit of water; one water unit = 100 ft. 3 . Average rainfall for prior 10 years = 2.62 ft.; Area contributing = 2000 ft. 2 . ($3.88/100 ft. 3 )(2,000 ft. 2 )(2.62 ft.) = $203.31 (d) Time extension renewal. Prior to the expiration of an existing time extension, the owner may request an extension on a form provided by the authority pursuant to subsection (a).

(Ord. No. 2018-055, § 9, 10-19-18)