For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-4-12 — Stormwater management criteria for permanent facilities and BMPs

Code of Ordinances of the City of Rochester, Minnesota (Codified through Ordinance No. 4589, enacted June 1, 2026 (Supp. No. 8, Update 2)) · Rochester Code of Ordinances § 6-4-12

Corpus is an independent public-information project, not the official City of Rochester website. Stable reference: corpuslaw.us/code/c39e6973-a67e-40ac-812a-4696e01ab6ce

Sec. 6-4-12. - Stormwater management criteria for permanent facilities and BMPs.

Stormwater management BMPs are required within a stormwater management plan for: new development projects with land disturbance area of one acre or greater, including projects less than one acre that are part of a larger common plan of development or sale; redevelopment projects with land disturbance area of one acre or greater and a net increase of new impervious surface area but less than one acre of new or fully reconstructed impervious surface area; and redevelopment projects where the sum of the new and fully reconstructed impervious surface area equals one or more acres. Permanent stormwater control facilities included as part of the final design for land development and redevelopment shall be addressed in the stormwater management plan and shall meet the following: (1) Post-construction stormwater management. Post-construction stormwater management must incorporate any combination of BMPs, with the highest preference given to green infrastructure techniques and practices (e.g., infiltration, evapotranspiration, reuse/harvesting, conservation design, urban forestry, green roofs, etc.) that promote volume reduction and retain the water quality volume on-site. Wet sedimentation basins and filtration systems are not volume reduction practices. If infiltration is prohibited, other volume reduction practices, wet sedimentation basins, and/or filtration basins may be considered. (2) Water quality volume for new development and redevelopment. For construction activity (excluding linear projects), the water quality volume must be calculated as one inch times the sum of the new and the fully reconstructed impervious surface area. Where the sum of the new and the fully reconstructed impervious area is less than one acre, the water quality volume must be calculated as one inch times the new, i.e. added, impervious surface area. (3) Water quality volume for linear projects. For linear projects, the water quality volume must be calculated as the larger of one inch times the new impervious surface or one-half inch times the sum of the new and the fully reconstructed impervious surface. Where the entire water quality volume cannot be treated within the existing right-of-way, a reasonable attempt to obtain additional right-of-way, easement, or other permission to treat the stormwater during the project planning process must be made. Volume reduction practices must be considered first. Volume reduction practices are not required if the practices cannot be provided cost effectively. If additional right-of-way, easements, or other permission cannot be obtained, owners of construction activity must maximize the treatment of the water quality volume prior to discharge from the MS4. (4) Stormwater management prohibitions. Infiltration systems are prohibited when the system would be constructed in areas: a. That receive stormwater runoff the following types of entities regulated under an NPDES/SDS industrial stormwater permit issued by the MPCA: automobile salvage yards; scrap recycling and waste recycling facilities; hazardous waste treatment, storage, or disposal facilities; or air transportation facilities that conduct deicing activities. b. That receive stormwater runoff from vehicle fueling and maintenance areas, regardless of the amount of new and fully reconstructed impervious area. c. With less than three feet of separation distance from the bottom of the infiltration system to the elevation of the seasonally saturated soils or the top of bedrock. d. Where high levels of contaminants in soil or groundwater will be mobilized by the infiltrating stormwater. To make this determination, the owners and/or operators of construction activity must complete the Minnesota Pollution Control Agency's site screening assessment checklist, which is available in the Minnesota Stormwater Manual, or conduct their own assessment. The assessment must be retained with the site plans. e. With predominately Hydrologic Soil Group D (clay) soils. f. Within 1,000 feet up-gradient or 100 feet down gradient of active karst features. g. Where soil infiltration rates are more than 8.3 inches per hour unless soils are amended to slow the infiltration rate below 8.3 inches per hour. h. Within an emergency response area (ERA) of a drinking water supply management area (DWSMA) as defined in Minn. R. pt. 4720.5100, subpt. 13, classified as high or very high vulnerability as defined by the Minnesota Department of Health. i. Within an ERA of a DWSMA classified as moderate vulnerability unless the permittee performs or approves a higher level of engineering review sufficient to provide a functioning treatment system and to prevent adverse impacts to groundwater. j. Outside of an ERA within a DWSMA classified as high or very high vulnerability unless the permittee performs or approves a higher level of engineering review sufficient to provide a functioning treatment system and to prevent adverse impacts to groundwater. (5) Off-site water quality treatment. For non-linear projects, where the water quality volume cannot cost effectively be treated on the site of the original construction activity, the owners of the construction activity are required to identify locations where off-site treatment projects can be completed. If the entire water quality volume is not addressed on the site of the original construction activity, the remaining water quality volume must be addressed through off-site treatment and, at a minimum, ensure the requirements of the items below are met: a. The city engineer must ensure off-site treatment project areas are selected in the following order of preference: 1. Locations that yield benefits to the same receiving water that receives runoff from the original construction activity. 2. Locations within the same department of natural resource (DNR) catchment area as the original construction activity. 3. Locations in the next adjacent DNR catchment area up-stream. 4. Locations anywhere within the city's jurisdiction. b. Off-site treatment projects must involve the creation of new structural stormwater BMPs or the retrofit of existing structural stormwater BMPs, or the use of a properly designed regional structural stormwater BMP. c. Off-site treatment projects must involve the creation of new structural stormwater BMPs or the retrofit of existing structural stormwater BMPs, or the use of a properly designed regional structural stormwater BMP. d. Off-site treatment projects must be completed no later than 24 months after the start of the original construction activity. If the city engineer determines more time is needed to complete the treatment project, the reason(s) for the delays and schedule(s) for completing the project must be provided in the annual report.

(Code 1965, § 146A.094; Ord. No. 4337, 4-9-2018; Ord. No. 4481, § 4, 11-14-2022)

Ask a question about Rochester law

Corpus searches the Rochester sections it holds and shows the ones that match, with their citations. Free, no sign-in.