§ 12A-235 — Stream buffer plan requirements
Code of Ordinances of the City of Columbia, Missouri (Codified through Ordinance No. 26252, enacted March 16, 2026 (Supp. No. 139)) · Columbia Code of Ordinances § 12A-235
Corpus is an independent public-information project, not the official City of Columbia website. Stable reference: corpuslaw.us/code/8179d50b-5313-4e6d-9c73-f9c9d64d5bc0
Sec. 12A-235. - Stream buffer plan requirements.
(a) All development plans and plats shall include or be accompanied by a stream buffer plan that sets forth an informative, conceptual and schematic representation of the proposed stream buffers by means of maps, graphs, charts, or other written or drawn documents to enable the city to determine whether the plan or plat is in compliance with the requirements of this article. (b) Stream buffer plans shall contain the following information: (1) A site plan map at a minimum scale of one (1) inch equals two hundred (200) feet. (2) Field delineated and surveyed streams, springs, seeps, bodies of water, sink holes, and wetlands (include a minimum of two hundred (200) feet into adjacent properties). (3) Delineated stream buffers. (4) Limits of the ultimate 100-year floodplain as shown on the adopted floodplain maps for the City of Columbia. (5) Steep slopes greater than fifteen (15) percent for areas adjacent to and within two hundred (200) feet of streams, wetlands, or other waterbodies. (c) A stream buffer plan shall be submitted in conjunction with the required land disturbance plan for each development, and the buffer must be clearly delineated on the site grading plan. Each site grading and drainage plan shall include a note stating, "There shall be no clearing, grading, construction or disturbance of vegetation except as specifically approved by the city."
(Ord. No. 19343, § 1, 1-2-07)
Ask a question about Columbia law
Corpus searches the Columbia sections it holds and shows the ones that match, with their citations. Free, no sign-in.
