§ 106-144 — Permit required; requirements
Code of Ordinances of the City of Joplin, Missouri (Codified through Ordinance No. 2026-123, enacted September 8, 2026. (Supp. No. 41, Update 3)) · Joplin Municipal Code § 106-144
Corpus is an independent public-information project, not the official City of Joplin website. Stable reference: corpuslaw.us/code/e7b47ec6-e5fc-4e47-a190-c13d7f40974a
Sec. 106-144. - Permit required; requirements.
1. Excavation permit required. Except as otherwise provided herein, no ROW user or other person shall perform excavation work in the ROW without an excavation permit. Any person desiring to excavate in the ROW shall first apply for an excavation permit, on an application form provided by the city, and submit the application fee and pay all applicable fees to obtain an excavation permit, in addition to any other building permit, license, easement, or other authorization required by law, unless such excavation must be performed on an emergency basis as provided herein. The cost of said permit shall be set out by the director. The director is authorized to draft an application form consistent with the requirements of this chapter. An excavation permit should be obtained for each project unless otherwise provided for in this chapter. A separate special permit or lease shall be required for excavation in or use of any real property interest of the city that is not ROW. It shall be unlawful for any person to perform excavation work within the city at any time other than from 6:00 A.M. to 9:00 P.M., Monday through Friday without prior approval from the city, except in the case of an emergency. No work shall be performed during city holidays, except in the case of an emergency. All excavation permits shall expire after 60 days from the date of issuance, unless otherwise specified in the excavation permit. An applicant whose excavation permit application has been withdrawn, abandoned or denied for failure to comply with this chapter shall not be refunded the application fee. 2. Facilities maintenance permit; exemptions. No person shall perform facilities maintenance at a specified location in the rights-of-way without first obtaining a facilities maintenance permit from the director, except where such facilities maintenance is expressly authorized by an existing valid excavation permit for the applicable facilities maintenance location or is exempt herein. In addition to the applicable conditions and obligations set forth in this chapter, conditions of a facilities maintenance permit shall be as established in such permit and shall include requirements of notice to and approval by the city whenever traffic lanes are to be obstructed, manhole covers or safety barriers removed or altered, temporary or other barricades installed, and other events set forth in the facilities maintenance permit. All facilities maintenance permits shall expire after 60 days from the date of issuance, unless otherwise specified in such permit. A facilities maintenance permit shall not be required for: a. ROW users performing routine maintenance which does not require excavation, does not disrupt traffic or pedestrians, and requires no more than four hours to complete, provided that at minimum two hours' notice is provided to the city during normal business hours; b. Emergency situations as more fully described in subsection 4 below; or c. Contractors working on the construction or reconstruction of public improvements and which are operating pursuant to a contract with the city for such construction; or d. Routine maintenance on previously approved small wireless facilities, replacement of small wireless facilities that are the same or smaller in size, weight, and height, or installation placement, maintenance, operation, or replacement of micro wireless facilities that are strung on cables between utility poles in compliance with applicable safety and building codes, when such work will not involve excavation, affect traffic patterns, obstruct traffic in the ROW, or materially impede the use of a sidewalk, and provided the ROW user submits as-builts of the new small wireless facilities or micro wireless facilities so the city may maintain an accurate inventory of facilities installed in the ROW. 3. Bulk permits. The director shall have the authority to establish procedures for bulk processing of applications and periodic payment of fees. 4. Emergencies. In the event of an emergency requiring immediate attention to remedy defects, and in order to avoid loss of damage to person or property, it shall be sufficient that the person conducting the work shall as soon as practicable notify the city of the location of the work and shall apply for the required ROW permit as soon as practicable following the commencement of the work, not to exceed the third business day thereafter, or as otherwise directed by the city. In the event the city becomes aware of an emergency requiring facilities work the city shall attempt to contact a representative of each ROW user affected, or potentially affected, by the emergency work. If no response is received by a particular ROW user to whom contact is attempted, the director may take whatever action he/she deems necessary to respond to the emergency, the cost of which shall be borne by the person whose action or inaction occasioned the emergency or by the ROW user if the emergency was occasioned by an act of nature. 5. ROW permit specific conditions. The director may also impose reasonable conditions upon the issuance of a permit and the performance of work in order to protect the public health, safety, and welfare, to ensure the structural integrity of the rights-of-way, to protect the property and safety of other users of the rights-of-way, and to minimize the disruption and inconvenience to the traveling public. 6. Codes incorporated. Every permit issued hereunder shall incorporate the requirements and terms of this chapter, agreements, and all applicable ordinances, to the extent permitted by law. The ROW user shall perform such work in accordance with the issued permit and applicable provisions of this chapter and any subsequent ordinances or regulations that may be adopted by the city regarding excavation or facilities maintenance work. In addition, all ROW users shall be subject to all technical specifications, design criteria, policies, resolutions, and ordinances now or hereafter adopted or promulgated by the city in the reasonable exercise of its police power relating to permits and fees, sidewalk and pavement cuts, facility location, construction coordination, surface restoration, and other requirements on the use of the rights-of-way. A ROW user shall perform all excavations or facilities maintenance in full compliance with all applicable engineering codes adopted or approved by the city, and in accordance with applicable statutes of the State of Missouri, and the rules and regulations of the public service commission, federal communications commission, and any other local, state or federal agency having jurisdiction over the parties. The ROW user shall comply with the excavation requirements of Missouri One Call established by RSMo. 319.010 et seq., as amended. A ROW user shall be responsible for all excavations or facilities maintenance done in the rights-of-way on its behalf, regardless of by whom the excavation or facilities maintenance is done. 7. Tree and landscape protection. Upon ten days' written notice and with the supervision of the city or as otherwise provided by law or agreement, the city may permit a ROW user to trim trees that overhang rights-of-way of the city so as to prevent the branches of such trees from coming in contact with facilities in the ROW, at its own expense, subject to the supervision and direction of the city. Nothing in this paragraph shall authorize the trimming of trees on private property without permission of the property owner. All cut materials shall be properly disposed. Unless otherwise approved in writing by the city, a ROW user shall not remove, cut or damage any trees or their roots in the rights-of-way. In reviewing any permit application, the city may require the applicant to directionally bore around or otherwise avoid disturbance to any tree or landscaping, existing facility, or other protected area in the rights-of-way. 8. Permit displayed. At all times during the work, permits shall be conspicuously displayed at the work site and shall be available for inspection by the director. 9. Modification requiring new permit. If at any time it appears that the duration or scope of the work is or will become materially different from that allowed by the permit, the ROW user shall inform the director. The director may issue a waiver, an extension or revised permit, or require that the ROW user reapply for a permit in accordance with all requirements of this chapter.
(Ord. No. 2019-073, § 1(Exh. A), 5-6-19)
Ask a question about Joplin law
Corpus searches the Joplin sections it holds and shows the ones that match, with their citations. Free, no sign-in.