For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 118-126 — Acceptance of restricted wastes; pretreatment requirements

Code of Ordinances of the City of Joplin, Missouri (Codified through Ordinance No. 2026-123, enacted September 8, 2026. (Supp. No. 41, Update 3)) · Joplin Municipal Code § 118-126

Corpus is an independent public-information project, not the official City of Joplin website. Stable reference: corpuslaw.us/code/18830a7d-3ecb-42dc-967b-215db20169b4

Sec. 118-126. - Acceptance of restricted wastes; pretreatment requirements.

(a) Acceptance of restricted wastes. If any waters or wastes are discharged or are proposed to be discharged into the city's sewers which contain any quantity of substance having the characteristics described in section 118-102 and/or are in violation of the standards of pretreatment provided in chapter 1, EPA Rules and Regulations, subchapter D, Water Programs Part 403, pretreatment standards, Federal Register Volume 46, No. 18, Wednesday, January 26, 1981, and any amendments thereto, and which, in the judgment of the superintendent, may have a deleterious effect upon the sewage works, processes, equipment or receiving waters, or which otherwise may create hazard to life or constitute a public nuisance, the superintendent may: (1) Reject the wastes; (2) Require, at the owner's expense, pretreatment facilities to reduce objectionable characteristics or constituents to within the maximum limits provided for in section 118-102 and/or federal, state or local pretreatment standards; and/or (3) Require control over the quantities and rates of discharge. (b) Design and installation. If the superintendent permits the pretreatment or equalization of waste flows, the design and installation of the pretreatment facilities shall be at the owner's expense. Construction drawings, specifications and other pertinent data shall be submitted for the approval of the superintendent and the state. No construction of such facilities shall be commenced until such approvals are obtained in writing. Construction shall be in accordance with the approval plans. (c) Maintenance. Where pretreatment facilities are provided for any waters or wastes, they shall be maintained continuously in satisfactory and effective operation by the owner, at his expense. (d) Publication of list of users in significant noncompliance. The superintendent shall publish annually, in the largest daily newspaper published in the city, a list of users which, during the previous 12 months, were in significant noncompliance with applicable pretreatment standards and requirements. As used in this subsection, the term "significant compliance" shall mean: (1) Chronic violations of wastewater discharge limits, defined for purposes of this section as those in which 66 percent or more of wastewater measurements taken for the same pollutant parameter during a six-month period exceed (by any magnitude), a numeric pretreatment standard or requirment, including Instantaneous Limits as defined in section 118-102; (2) Technical review criteria (TRC) violations, defined for purposes of this section as those in which 33 percent or more of wastewater measurements taken for each pollutant parameter during a six-month period equals or exceeds the product of the numeric pretreatment standard or requirment including Instantaneous Limits, as defined by Section 118-102, the daily maximum limit or the average limit multiplied by the applicable criteria (1.4 for BOD, TSS, fats, oils and grease, and 1.2 for all other pollutants except pH); (3) Any other violation of a pretreatment standard or requirment as defined by section 118-102 (daily maximum, long-term average, instantaneous limit, or narrative standard) that the superintendent determines has caused, alone or in combination with other discharges, interference or pass through, including endangering the health of POTW personnel or the general public; (4) Any discharge of pollutants that has caused imminent endangerment to the public or to the environment, or has resulted in the superintendent's exercise of his emergency authority to halt or prevent such a discharge; (5) Any other violation of a pretreatment standard or requirment as defined by this article (daily maximum, long-term average, instantaneous limit, or narrative standard) that the superintendent determines has caused, alone or in combination with other discharges, interference or pass through, including endangering the health of POTW personnel or the general public; (6) Failure to meet, within 90 days of the scheduled date, a compliance schedule milestone contained in a wastewater discharge permit or enforcement order for starting construction, completing construction or attaining final compliance; (7) Failure to provide, within 30 days after the due date, any required reports, including baseline monitoring reports, reports on compliance with categorical pretreatment standard deadlines, periodic self-monitoring reports, and reports on compliance with compliance schedules; (8) Failure to accurately report noncompliance; or (9) Any other violation which, which may include a violation of best management practices, the superintendent determines will adversely affect the operation or implementation of the local pretreatment program.

(Ord. No. 2022-098, § 1, 6-20-22)

Ask a question about Joplin law

Corpus searches the Joplin sections it holds and shows the ones that match, with their citations. Free, no sign-in.