§ 118-152 — Application; issuance
Code of Ordinances of the City of Joplin, Missouri (Codified through Ordinance No. 2026-123, enacted September 8, 2026. (Supp. No. 41, Update 3)) · Joplin Municipal Code § 118-152
Corpus is an independent public-information project, not the official City of Joplin website. Stable reference: corpuslaw.us/code/6619462c-feeb-40a0-88ed-ca2db0b0e305
Sec. 118-152. - Application; issuance.
(a) Application for an industrial discharge permit shall be made by the owner or his agent on a special form provided by the city. Existing users classified as a significant industrial user shall file the completed application no later than October 1, 1984. New users that may be classified as significant industrial users must file a completed application at least 90 days prior to connecting to or contributing to the city sewers. The following information, in units and terms appropriate for evaluation, shall be included in the application: (1) Name, address and standard industrial classification number of the facility, including the name of the operator and owner. Contact information, description of activities, facilities, and plant production processes on the premises. (2) Signature and title of the official completing the application. (3) Location of plant. (4) Manufacturing or service activity conducted at the plant, including all materials which are or could be discharged. (5) Wastewater constituents and characteristics, including but not limited to those mentioned in section 118-102, as determined by a reliable analytical laboratory, and the following: a. Types of wastes generated, and a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW. Type and amount of raw materials processed (average and maximum per day). b. The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for Existing Sources. c. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the Standard or by the superintendent, of regulated pollutants in the discharge from each regulated process. d. Instantaneous, Daily Maximum, and long-term average concentrations, or mass, where required, shall be reported. e. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in section 118-208 of this article. Where the Standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the superintendent or the applicable Standards to determine compliance with the Standard. f. Sampling must be performed in accordance with procedures set out in section 118-208 of this article. (6) Time and duration of contribution. (7) Average daily and three-minute peak wastewater flow rates, including daily, monthly and seasonal variations if any. (8) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections and appurtenances by the size, location and elevation. Also included should be a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes. (9) Where known, the nature and concentration of any pollutants in the discharge which are limited by any city, state or federal pretreatment standards, and a statement regarding whether or not the pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance and/or additional pretreatment is required for the user to meet the applicable pretreatment standards. (10) If additional pretreatment and/or operation and maintenance will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment. The completion date in this schedule shall be no later than the compliance date established for the pretreatment standard. The following conditions shall apply to this compliance schedule: a. A schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standard, e.g., hiring an engineer, completing preliminary plans, executing contracts for major components, commencing construction, completing construction, etc. b. No increment referred to in subsection (10)a of this subsection shall exceed nine months. c. Not later than 14 days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the superintendent, including, as a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for the delay, and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports to the superintendent. (11) Each product produced, by type, amount, process and rate of production. (12) Number of employees in each plant, by shifts. Hours of operation and proposed or actual hours of operation. (13) Source of water supply at each plant and the volume of water used by each plant daily, specified as to each source. (14) Description of raw water treatment and/or industrial waste pretreatment facilities currently in use. (15) A list of any environmental control permits held by or for the facility. (16) The location for monitoring all wastes covered by the permit. (17) Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in section 118-121(a)(3) (40 CFR 403.6(e)). (18) Any requests for a monitoring waiver (or a renewal of an approved monitoring waiver) for a pollutant neither present nor expected to be present in the discharge based on section 118-129(d)(2) [40 CFR 403.12(e)(2)]. (19) Any other information as may be deemed by the city to be necessary to evaluate the permit application. (b) Permit Decisions. The city will evaluate the data furnished by the user and may require additional information. After evaluation and acceptance of the data furnished, the city may issue an industrial discharge permit, subject to the terms and conditions provided in this article. Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. (c) Applications and Signatories. (1) All wastewater discharge permit applications, user reports and certification statements must be signed by an authorized representative of the user and contain the certification statement in section 118-182. (2) If the designation of an authorized representative is no longer accurate because a different individual or position has responsibility for the overall operation of the facility or overall responsibility for environmental matters for the company, a new written authorization satisfying the requirements of this Section must be submitted to the superintendent prior to or together with any reports to be signed by an authorized representative. (3) A facility determined to be a non-significant categorical industrial user by the superintendent must annually submit the signed certification statement in Section 118-182.
(Ord. No. 2022-098, § 1, 6-20-22)
Ask a question about Joplin law
Corpus searches the Joplin sections it holds and shows the ones that match, with their citations. Free, no sign-in.
