For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 26-756 — Standards for closing building

Code of Ordinances of the City of Joplin, Missouri (Codified through Ordinance No. 2026-123, enacted September 8, 2026. (Supp. No. 41, Update 3)) · Joplin Municipal Code § 26-756

Corpus is an independent public-information project, not the official City of Joplin website. Stable reference: corpuslaw.us/code/116207ff-f1b6-4025-ae9c-47e5e10415fc

Sec. 26-756. - Standards for closing building.

(a) Temporary closing. (1) All buildings and structures which are temporarily closed as a result of an order of vacation by the director shall be closed and kept closed until the building or structure complies with the building code and this article or is demolished, in accordance with the following standards: a. All exterior openings are to be closed. b. Materials missing or broken shall be replaced by similar construction or may be replaced by solid wood construction of exterior grade plywood at least one-half inch thick. c. Materials approved by the director may be used which provide equivalent protection to the building from those attempting to gain entrance. d. Any materials used to close openings in exterior walls or open buildings shall be neatly installed in a manner substantially in accordance with recognized levels of workmanship for the building construction industry. e. The roof shall be made watertight. f. All loose and hanging exterior parts shall be removed. g. All debris from the interior and exterior of the premises shall be removed. (2) No building temporarily closed shall remain vacant and unrepaired for more than 150 days. (3) If a building, temporarily closed as the result of an order of vacation by the director, remains closed in excess of one hundred fifty (150) days, a dangerous building case shall be initiated against the structure to determine whether the structure should be demolished or the owner of the structure may make application for a permit as provided by section 26-627 of the Joplin City Code subject to the conditions therein. (4) If a building, temporarily closed as a result of an order of vacation by the director, is not closed and kept closed in accordance with the standards set forth in this subsection, a dangerous building case may be initiated against the structure to determine whether the structure should be demolished. (b) Voluntary indefinite closing. All buildings and structures that do not meet the criteria for a permit as provided by section 26-627 of the Joplin City Code and that are voluntarily closed for an indefinite period shall be closed and kept in accordance with the following standards: (1) A permit shall be obtained before commencement of work. (2) All exterior openings are to be closed. (3) Materials missing or broken shall be replaced by similar construction or may be replaced by solid wood construction of exterior grade plywood at least one-half inch thick. (4) Materials approved by the director may be used which provide equivalent protection to the building from those attempting to gain entrance. (5) Any materials used to close openings in exterior walls or open buildings shall be neatly installed in a manner substantially in accordance with recognized levels of workmanship for the building construction industry. (6) All plywood shall be painted with two coats of exterior paint. (7) The building or structure shall be baited for roaches and rodents. (8) The roof shall be made watertight. (9) All loose and hanging exterior parts shall be removed. (10) All debris from the interior and exterior of the premises shall be removed.

(Code 1977, § 9-240; Ord. No. 2003-023, § 4, 2-17-03)

Ask a question about Joplin law

Corpus searches the Joplin sections it holds and shows the ones that match, with their citations. Free, no sign-in.