For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.1680 — Lot

Code of Ordinances of the City of Lee's Summit, Missouri (Codified through Ordinance No. 10423, enacted July 14, 2026 (Supp. No. 56)) · Lee's Summit Unified Development Ordinance § 15.1680

Corpus is an independent public-information project, not the official City of Lee's Summit website. Stable reference: corpuslaw.us/code/939d3771-5758-42c2-a8e8-a840c8f4e48a

Sec. 15.1680. - Lot.

Lot shall mean a parcel of land occupied by or intended for a use allowed in this chapter, including one main building together with its accessory buildings, open spaces, and parking spaces required by this chapter, and having its principal frontage upon a public street or road as established by this chapter. The word "lot" shall include the word "plot," "tract," or "parcel." The derivations of lot shall maintain the following definitions: A. Lot area. The area of a horizontal plane bounded by the vertical planes through front, rear and side lot lines. B. Lot, corner. A lot abutting upon two or more streets at their intersection. C. Lot depth. The mean horizontal distance between the front and rear lot lines. D. Lot, double frontage. A lot having frontage on two non-intersecting roads; as distinguished from a corner lot. This definition shall include through lots. E. Lot, interior. A lot other than a corner lot whose sides do not abut upon any street. F. Lot line. The property boundary line of any lot. The derivations or modifications of lot line shall maintain the following definitions. [image omitted; see the official code] 1. Lot line, front. The lot line abutting a street or private drive. In the case of a corner lot, the front lot line shall normally be the lot line with the shortest length. In the case of a double frontage lot, the front lot line shall be the lot line adjacent to the street that provides primary access to the lot or towards which the main building on the lot is oriented. 2. Lot line, rear. Any lot line that is not a front lot line or a side lot line. 3. Lot line, side. Any lot line that intersects the front lot line. A side lot line shall include any linked line segments or arcs that have a bearing which is within 45 degrees of a line drawn perpendicular to the front lot line. Where the application of the rules is ambiguous or where the property owner requests an alternative designation, the Director may specifically designate the various lot lines for a particular lot. [image omitted; see the official code] G. Lot width. The horizontal distance between the side lot lines, measured at the front building line.

Ask a question about Lee's Summit law

Corpus searches the Lee's Summit sections it holds and shows the ones that match, with their citations. Free, no sign-in.