For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2.060 — Submission of technical studies

Code of Ordinances of the City of Lee's Summit, Missouri (Codified through Ordinance No. 10423, enacted July 14, 2026 (Supp. No. 56)) · Lee's Summit Unified Development Ordinance § 2.060

Corpus is an independent public-information project, not the official City of Lee's Summit website. Stable reference: corpuslaw.us/code/01b5a28c-7beb-4986-9b5f-aaffc6c544c8

Sec. 2.060. - Submission of technical studies.

A. Technical studies required by Director. 1. The Director may require applicants for rezoning, special use permits, preliminary or final development plans or preliminary plats to submit any technical studies that the Director deems necessary to enable the Commission or Governing Body to fully evaluate the application. Examples of technical studies that may be required shall include, but not be limited to, traffic studies, engineering studies, geologic or hydrogeologic studies, flood studies, environmental impact assessments, noise studies, photometric plans (for outdoor lighting) or surface water management/drainage studies. 2. The persons or firms preparing the studies shall be acceptable to the Director. The applicant may appeal the Director's determination as to the requirement for a technical study to the Commission by filing a written notice of appeal with the Director within seven days after the Director's decision. The Director shall transmit the notice of appeal to the Commission, and the Commission shall hear the appeal at the next scheduled Commission meeting. If the Commission affirms the Director's determination, the applicant may appeal the decision of the Commission to the Governing Body by filing a written notice of appeal with the Director within seven days after the Commission's decision. The Director shall transmit the notice of appeal to the Governing Body, and the Governing Body shall hear the appeal at their next regularly scheduled meeting. The costs of all studies shall be borne by the applicant. B. Technical studies required by Commission or Governing Body. Notwithstanding the fact that the Director did not require submission of a technical study in support of an application, either the Commission or the Governing Body may require the submission of a technical study prior to taking action on the application.

Ask a question about Lee's Summit law

Corpus searches the Lee's Summit sections it holds and shows the ones that match, with their citations. Free, no sign-in.