For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21-101 — Mural permit

Code of Ordinances of the City of Lee's Summit, Missouri (Codified through Ordinance No. 10423, enacted July 14, 2026 (Supp. No. 56)) · Lee's Summit Code of Ordinances § 21-101

Corpus is an independent public-information project, not the official City of Lee's Summit website. Stable reference: corpuslaw.us/code/ecf4bdfd-f0af-418b-9206-06cd43787fd7

Sec. 21-101. - Mural permit.

A. No mural shall be installed unless written permission is first obtained by the owner of the building upon which the mural is to be placed, or the building owner's agent, and a mural permit is obtained from the Director of Planning and Codes Administration, or his/her designee. B. Application requirements. Each permit application shall contain, but not be limited to, the following information: 1. Site plan showing the lot and building dimensions and indicating the proposed location of the mural. 2. Pictures of the building elevations. 3. A scale drawing and color photo of the building elevation showing the proposed size and placement of the mural. 4. A colored drawing of the proposed mural. 5. A description of the proposed maintenance schedule that includes the time frame for the life of the mural and method for removal, if applicable. 6. Written confirmation by the mural provider/installer that no damage or negative impact will occur to the wall surface that the mural is to be applied or affixed to. 7. Written permission from the owner of the building to which the mural is intended to be applied, if applicant is not the building owner. 8. An acknowledgement that the mural must be removed or covered if so ordered by the Director for failure to maintain or for reaching a state of dilapidation, as described in subsection E.3. above. C. Mural permit approval. Applications for a mural permit in the downtown area shall be distributed to Downtown Main Street for comment regarding consistency between the application and the requirements herein. All other mural permit applications will be reviewed and approved by City Planning staff. No mural permit shall be approved unless the Director, or his/her designee, shall find that these requirements have been fulfilled. D. Appeals. Appeals of the Director's decision to approve or not approve a mural application may be made in writing to the City Clerk within ten (10) days of the Director's decision. Said appeal shall be placed on an upcoming City Council meeting for consideration and disposition.

(Ord. No. 7954, § 1, 9-1-2016)

Ask a question about Lee's Summit law

Corpus searches the Lee's Summit sections it holds and shows the ones that match, with their citations. Free, no sign-in.