§ 26-221 — Violation
Code of Ordinances of the City of Lee's Summit, Missouri (Codified through Ordinance No. 10423, enacted July 14, 2026 (Supp. No. 56)) · Lee's Summit Code of Ordinances § 26-221
Corpus is an independent public-information project, not the official City of Lee's Summit website. Stable reference: corpuslaw.us/code/b86a29fa-54ae-49c0-a04c-455973add088
Sec. 26-221. - Violation.
A. No Person shall perform temporary traffic control, excavate or work in the right-of-way in violation of Section 26-131.A. or Section 26-131.F. of this article. Any violation of Section 26-131.A. or Section 26-131.F. shall result in the immediate issuance of a citation to the person and enforcement action pursuant to Section 26-223 hereof. B. Except as provided in subsection A. of this section, if the City Engineer determines that a ROW-user has committed a violation of this article, any law or ordinance, or a condition placed on the right-of-way permit or the temporary traffic control permit, the City Engineer shall make a written demand upon the ROW-user to remedy such violation, which may include the issuance of a stop work order. The demand shall state that the continued violation may be cause for revocation of the right-of-way permit or the temporary traffic control permit as provided for herein, or legal action if applicable. C. A violation will allow the City Engineer, at his or her discretion, to place additional or revised conditions on the right-of-way permit or the temporary traffic control permit, specifically related to the manner in which the violation is cured by the ROW-user. 1. Within fourteen (14) calendar days of receiving notification of the violation, the ROW-user shall contact the City Engineer with a plan, acceptable to the City Engineer, for correction of the violation. 2. Upon determination by the City Engineer that the violation creates a threat to public safety, the ROW-user shall within twenty-four (24) hours of notice from the City contact the City Engineer with a plan, acceptable to the City Engineer, for correction of the violation. 3. Upon determination by the City Engineer that the violation creates an immediate threat to public safety, the ROW-user shall within one (1) hour of notice from the City contact the City Engineer with a plan, acceptable to the City Engineer, for correction of the violation. 4. A ROW-user's failure to contact the City Engineer, ROW-users failure to submit an acceptable plan, or ROW-user's failure to reasonably implement the approved plan shall be cause for immediate revocation of the right-of-way permit or the temporary traffic control permit. 5. In the event a ROW-user's performance of any of the terms, conditions or obligations required by this article or Chapter or a Franchise or License is prevented by a cause or event not within a ROW-user's control, such inability to perform shall be deemed excused and no penalties or sanctions shall be imposed as a result thereof. For the purpose of this section, causes or events not within the control of a ROW-user shall include, without limitation, acts of God, strikes, sabotage, riots or civil disturbances, failure or loss of utilities, explosions, acts of public enemies, and natural disasters such as floods, earthquakes, landslides, and fires.
(Ord. No. 8347, § 1, 2-15-2018)
Ask a question about Lee's Summit law
Corpus searches the Lee's Summit sections it holds and shows the ones that match, with their citations. Free, no sign-in.
