Sec. 3.540 - Building permit for foundation only.
No foundation shall be constructed without first obtaining, at a minimum, a building permit for foundation only from the City in accordance with the current building code. No building permit for foundation only will be issued before the following has occurred: A. The following facilities, if required by approved engineering plans, are complete as indicated: 1. The sanitary sewer serving the development is substantially complete. Substantial completion of the sanitary sewer shall include substantial completion of any off-site or outfall sewer serving the development. Any new sewer main serving the building site must be completely connected to the existing system and must be operational. 2. A substantially complete street network (including all associated street and traffic control signage) serving the development, unless otherwise approved by the Director and the Fire Department. Exception: For a single commercial site (single building/single lot) a building permit will be allowed following issuance of a site development permit, provided there is no impact to any other users. A certificate of substantial completion shall be issued prior to any certificate of occupancy. No water or sanitary sewer service lines shall be permitted to connect to the public mains until the mains are substantially complete. B. Erosion and sediment control has been installed according to the current regulations and according to Sections 2150 and 5100 of the DCM. C. If required by Section 5600, the as-graded record drawing(s) of the development's master drainage plan have been submitted to and accepted by the Director. D. Conditions of all development agreements covering the development are met, if applicable.
(Ord. No. 8895, § 1, 6-9-2020)
Ask a question about Lee's Summit law
Corpus searches the Lee's Summit sections it holds and shows the ones that match, with their citations. Free, no sign-in.