§ 32-8 — Reimbursement of funds for infrastructure upsizing

Code of Ordinances of the City of Lee's Summit, Missouri (Codified through Ordinance No. 10423, enacted July 14, 2026 (Supp. No. 56)) · Lee's Summit Code of Ordinances § 32-8

Corpus is an independent public-information project, not the official City of Lee's Summit website. Stable reference: corpuslaw.us/code/cc8a45df-ce72-402e-a5bd-b4d9c5637db3

Sec. 32-8. - Reimbursement of funds for infrastructure upsizing.

A. Under special agreements as provided in Section 32-5, the City may permit an extension of its water distribution or sewerage collection system to be installed by and at the expense of the applicants desiring to secure such service. In all such instances the installations shall include such public fire hydrants as the City may determine are required to provide adequate fire protection service. All installations of water and sewer extensions shall conform to the Design and Construction Manual and plans and specifications approved by the Department and shall be made under the supervision of the Department. B. Investments by developers in local facilities in their respective development areas, such as distribution mains, fire hydrants, sewer laterals, manholes and other local appurtenances will not be refunded by, or become an obligation of, the Department, as such investments are considered as accrued benefits to the improved property and will be recovered through the increase in value of the property. C. As set forth in Section 32-5 and the Design and Construction Manual, landowners may be required to construct enlarged water mains and/or sewers to serve adjacent areas. The extra cost of the enlarged water main or sewer will be reimbursed as set forth in the contract with the landowner according to the following policy and the provisions of the Design and Construction Manual: 1. The amount reimbursed shall be based upon the City infrastructure planning requirement versus the minimum infrastructure requirements necessary to serve the development. 2. Interest at a rate to be specified in the contract will be paid by the Department on the unpaid balance commencing on the date of acceptance of the facility by the City. 3. Payments will be made as provided in the contract, subject to the following limitations: a. Interest rate shall not exceed five (5) percent per annum. b. Unpaid interest may be added to the principal annually. c. Payments will be made by the Department out of surpluses accumulated after all other necessary expenses and debt services are satisfied. D. The Department reserves the right to determine the size of the pipe necessary in making such extension, in accordance with the Design and Construction Manual. E. Where the main or extension is to be installed on private property or in a private street, the owner thereof shall provide, free of cost to the City, necessary construction and permanent easements and an unobstructed and uninterrupted right-of-way for installation, inspection, operation, maintenance, enlargement, replacement, alteration, and extension of the main or extension. The permanent easement shall be fifteen (15) feet and the construction easement shall be thirty (30) feet. F. The ownership of the extension installed under this rule shall at all times be in the name of the City, upon final acceptance by the City of the improvements. G. Nothing contained in this section shall limit the City from extending its distribution system wherever it may determine that circumstances so warrant.

(Code 1988, § 32-8)

Ask a question about Lee's Summit law

Corpus searches the Lee's Summit sections it holds and shows the ones that match, with their citations. Free, no sign-in.