For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 34-11 — Industrial users without NPDES stormwater discharge permit

Code of Ordinances of the City of Lee's Summit, Missouri (Codified through Ordinance No. 10423, enacted July 14, 2026 (Supp. No. 56)) · Lee's Summit Code of Ordinances § 34-11

Corpus is an independent public-information project, not the official City of Lee's Summit website. Stable reference: corpuslaw.us/code/1ff9714d-ab67-4b8f-ba1c-ef1b96dc2eab

Sec. 34-11. - Industrial users without NPDES stormwater discharge permit.

A. Applicability. The following additional requirements as outlined in Subsections 34-11.B—F shall apply to all industrial users that do not have a facility-specific NPDES stormwater discharge permit. B. Self-monitoring and self-inspections. The director may require industrial users to conduct self-inspections and self-monitoring of stormwater discharges, and provide reports of such activities to the director in a manner deemed appropriate by the director. C. Records maintenance and retention. Industrial users shall maintain the following records and shall retain such records for a period of at least three years, unless the facility has been specifically notified of a longer retention period by the director. The three-year retention period shall be extended automatically for the duration of any litigation concerning compliance with this chapter. The following information shall be required: 1. Date and time, volume and methods of removal and disposal and location of disposal site(s) for solids, sludge, grease, filter backwash, or other pollutants removed in the course of treatment or control of wastewater. Records of receipt by the disposal facility of all such wastes removed from the industrial users premises shall also be maintained and retained; 2. Safety data sheets, incoming hazardous waste manifests, outgoing hazardous waste manifests, records of sludge and other residual waste disposal, sampling records, analytical reports, production records, purchase records, reports submitted to regulatory agencies and other related records; 3. Any permit applications, reports, and other records concerning industrial user discharges. D. Stormwater Pollution Prevention Plans, SWPPPs. The director may require industrial users to prepare, submit for review and comment, and implement SWPPPs as set forth in this section. The submitted SWPPP shall be modified in accordance with the director's comments. Review of such plans shall not relieve the industrial user from responsibility for modifying its facility as necessary to meet the requirement of this chapter. Such SWPPP shall address the following items: 1. Description and location of stored chemicals, raw materials and other significant materials; 2. Prevention of exposure of significant materials to precipitation; 3. On-site stormwater treatment; 4. Release prevention, including BMPs for: a. Selection and construction of equipment; b. Equipment operation, maintenance, and inspection procedures; c. Personnel training and supervision; and d. Security measures to prevent vandalism; 5. Spill containment; 6. Procedures for immediate notification as outlined in Section 34-14 to the director of any spill or accidental discharge of significant materials to the MS4, and procedures for follow-up written notification; 7. BMPs or procedures to prevent adverse impacts of any spill. Such procedures include, but are not limited to: Inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of facility runoff, employee training, measures for containing materials, and emergency response procedures and equipment; 8. Such other practices, facilities, or methods as required by the director. The director may require any owner of a facility to modify the facility's SWPPP if in the best professional judgment of the director, the SWPPP does not comply with the requirements of the facility's NPDES permit to discharge stormwater associated with industrial activity. Notification of deficiencies in a facility's SWPPP will be in writing and submitted to the facility owner. The director will give the facility operator a reasonable amount of time, not to exceed fifteen (15) calendar days, to make the necessary changes in the SWPPP. E. Monitoring and control of discharges. The director may require industrial users to implement BMPs where deemed necessary by the director to achieve the objectives of the City's current NPDES requirements. The director may establish monitoring requirements, pollutant limitations and other restrictions on industrial user discharges to the MS4. Such monitoring requirements, pollutant limitations, or other restrictions may be as stringent as or more stringent than requirements set forth in an NPDES permit issued by the State of Missouri or EPA to the industrial user for such discharge, if deemed necessary by the director to achieve the objectives of the City's stormwater management program. F. The City may enter into agreements with other jurisdictions to require an industrial user to sample, obtain information, and monitor and control the quality of indirect discharges to the MS4 from industrial users located outside the City. These agreements may also be negotiated with neighboring jurisdictions for industrial users located within the City.

(Ord. No. 8311, § 1, 12-21-2017)

Ask a question about Lee's Summit law

Corpus searches the Lee's Summit sections it holds and shows the ones that match, with their citations. Free, no sign-in.