§ 6.1010 — Mining

Code of Ordinances of the City of Lee's Summit, Missouri (Codified through Ordinance No. 10423, enacted July 14, 2026 (Supp. No. 56)) · Lee's Summit Unified Development Ordinance § 6.1010

Corpus is an independent public-information project, not the official City of Lee's Summit website. Stable reference: corpuslaw.us/code/a43a26af-856f-4c82-ace1-693684a79d34

Sec. 6.1010. - Mining.

A. Permits. 1. Open face quarry, sand or gravel pit for the purpose of removing, screening, crushing, washing, or storage of clay, stone, gravel; concrete batching plant; asphalt plant; and related industries. a. No permit shall be issued until the location, development plan and method of operation, including necessary structures, have been submitted to and approved in writing by the Commission and Governing Body. b. Such operation shall make provision for the preservation or restoration of the ground surface and cover and shown on the Development Plan. c. The special use permit shall not exceed five years but may be renewed by the Governing Body after public hearing. 2. Underground mine. a. No permit shall be issued until the location, development plan and method of operation, including necessary structures, have been submitted to and approved in writing by the Commission and Governing Body. b. The permit shall be for a limited period of time not to exceed ten years, and shall be subject to regulations and restrictions prescribed by the Governing Body. B. Prior to initiation of mining activities an application for a special use permit must be submitted that provides the following: 1. Written stipulations that the activity will not have any harmful impacts on the environment (air, water, natural landscape), neighboring residents and businesses, or to livestock. 2. A specific development plan indicating the extent of the area proposed to be mined and time schedule for completion of mining operations. 3. Information as to how the operation will be buffered and methods to assure that no harmful off-site impacts will occur. 4. A transportation plan detailing routes to be used by vehicles serving the site, weight limits and traffic volumes. 5. Information on hours of operation and procedures (on- and off-site) related to any on-site blasting that might occur. 6. Profiles describing any proposed subsequent use of the mined-out areas. 7. Adequate financial bonding for damages. C. The removal area shall be completely enclosed with a fence not less than 6 feet in height. D. An earthen berm shall be provided that shields all operations from ground level view along all property lines. E. Where mining is occurring beneath agriculturally zoned properties the following conditions must be met: 1. All surface access to such underground mine must be from a heavy industrial district. 2. No activities shall be conducted upon the surface of such mine or mined-out area other than as permitted in the agricultural district. 3. Exhaust air vents, air shafts or other surface features necessary and incidental to the underground operation shall be enclosed on four sides to a height of at least eight feet. No noxious gas or fumes shall emanate from any exhaust air vent on the surface of such mine or mined-out area. Such facilities shall not exceed 45 feet in height and be no closer than 30 feet to any property line.

Ask a question about Lee's Summit law

Corpus searches the Lee's Summit sections it holds and shows the ones that match, with their citations. Free, no sign-in.