§ 220.120 — Individual Lot, Residential Use, Storage Units And Bulk Refuse Containers
Code of Ordinances, City of O'Fallon, Missouri (Code 2026-10-22) · O'Fallon City Code § 220.120
Corpus is an independent public-information project, not the official City of O'Fallon website. Stable reference: corpuslaw.us/code/9f03457b-1c6a-405a-bfd2-e2271666323d
Section 220.120: Individual Lot, Residential Use, Storage Units And Bulk Refuse Containers.
A. Units Permitted. Residential homeowners (and only homeowners, these regulations do not apply to developers or commercial builders) may maintain on their lot, during periods of active construction, portable, weather-resistant receptacles designed for the storage of building materials, supplies and equipment; or bulk containers transported to and from the residence by trucks or trailers for the collection and eventual disposal of construction waste. Structures will include, but not be limited to: utility and storage sheds; other small temporary structures or shelters; commercial or industrial shipping containers; or other ground-mounted units designed for long-term storage; semi-trailers; carriers; or haulers; and other items designed for transport as well as storage. B. Permits. Residential lot owners may maintain a "PODS®" type unit (portable on demand storage) or construction dumpster on site for up to five (5) days without a permit. Any use that will require the unit to stay on the residential lot for more than five (5) days shall require a permit. Where permits are required, the permit shall be issued for a thirty (30) day period of time. If the activities on the lot require the use of a receptacle for more than thirty (30) days, then the applicant may apply for an extension. As part of the application for an extension, the applicant shall provide a timetable for completion of the project and shall call out any conditions needed to insure that health, safety and traffic concerns are addressed in a manner as is reasonable and appropriate under the circumstances. The primary responsibility for securing the necessary permits shall be the property owner(s). However, a duly authorized agent, purchaser, lessee, devisee or judiciary may be allowed to represent the owner with proper consent. C. Performance Standards. No temporary storage unit or bulk refuse container allowed on a residential lot shall be set up or operated in any manner so as to create any dangerous, injurious or otherwise objectionable condition so as to adversely affect the surrounding area or adjoining premises. 1. Storage units/bulk containers must be located on the same lot where the construction work is being done. 2. Storage units/bulk containers must be located on a hard (concrete, asphalt or other improved) surface. 3. Storage units/bulk containers must be maintained on the ground; stacking of storage units will not be permitted. 4. Storage units/bulk containers shall not block access to utilities or public services (i.e., manholes, meters, fire hydrants, etc.). 5. Storage units/bulk containers shall not encroach on any public right-of-way, roadway or sidewalk; all units must be fully contained on the subject property. 6. The property owner shall maintain the integrity of the storage unit/bulk container while it is on site. a. If the storage unit/bulk container is breached, the property owner is responsible for insuring that trash, debris or any other materials are not deposited on the surrounding lots. b. The unit exteriors shall be kept clean and shall be painted. c. The unit exteriors shall be free of rust and corrosion. d. Units exhibiting more than normal wear and tear shall be removed and repaired. D. Schedule Of Fees, Costs And Expenses. The City Council shall establish a Schedule of Fees, Costs and Expenses for all matters pertaining to the Sign Code. The Schedule of Fees, Costs and Expenses is identified within Appendix B of Title IV: Land Use and shall be filled with the City Clerk and posted in the offices of the Community Development Department. The schedule shall only be amended by the City Council and shall not require a recommendation from the Planning and Zoning Commission. The processing fee is applicable regardless of approval of the permit. A permit approved by the Planning and Engineering Department is not valid until the permit fee has been paid in full.
[R.O. 2008 § 220.120; Ord. No. 5216 § 1, 8-23-2007 ]
Ask a question about O'Fallon law
Corpus searches the O'Fallon sections it holds and shows the ones that match, with their citations. Free, no sign-in.
