§ 120-10 — Noncompliance reporting
Code of the City of Springfield, Missouri (Supp. No. 23, Update 2: codified through G.O. No. 6973, enacted January 12, 2026) · Springfield, Mo., City Code § 120-10
Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/d7398f1f-1a01-46d4-a933-f620e0eba692
Sec. 120-10. - Noncompliance reporting.
The director shall publish annually, in a newspaper(s) of general circulation that provides meaningful public notice within the jurisdiction(s) served by the POTW, a list of the users which, during the previous 12 months, were in significant noncompliance with applicable pretreatment standards and requirements. The term significant noncompliance shall mean as follows: (1) Chronic violations of wastewater discharge limits, defined here as those in which 66 percent or more of all of the measurements taken during a six-month period exceed (by any magnitude) a numeric pretreatment standard or requirement, including instantaneous limits, as defined by 40 CFR 403.2(1); (2) Technical review criteria (TRC) violations, defined here as those in which 33 percent or more of the measurements for each pollutant parameter taken during a six-month period equals or exceeds the product of the numeric pretreatment standard or requirement, including instantaneous limits, as defined by 40 CFR 403.3(1) multiplied by the TRC (TRC = 1.4 for BOD, TSS, fats, oils and grease, and 1.2 for all other pollutants except pH); (3) Any other discharge violation of a pretreatment standard or requirement as defined by 40 CFR 403.3(1) (daily maximum, longer-term average, instantaneous limit, or narrative standard) that the POTW determines has caused, alone or in combination with other discharges, interference or pass through, including endangering the health of POTW personnel or the general public; (4) Any discharge of pollutants that has caused imminent endangerment to the public or to the environment, or has resulted in the city's exercise of its emergency authority to halt or prevent such a discharge; (5) Failure to meet, within 90 days of the scheduled date, a compliance schedule milestone contained in a wastewater discharge permit or enforcement order for starting construction, completing construction or attaining final compliance; (6) Failure to provide, within 30 days after the due date, any required reports, including baseline monitoring reports, reports on compliance with categorical pretreatment standard deadlines, periodic self-monitoring reports, and reports on compliance with compliance schedules; (7) Failure to accurately report non-compliance; or (8) Any other violation or group of violations, which may include a violation of best management practices, which the POTW determines will adversely affect the operation or implementation of the local pretreatment program.
(G.O. No. 6488, § 1, 12-10-2018)
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.
