§ 120-192 — Permit application
Code of the City of Springfield, Missouri (Supp. No. 23, Update 2: codified through G.O. No. 6973, enacted January 12, 2026) · Springfield, Mo., City Code § 120-192
Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/d2f8e9b4-1c00-4968-9804-8d8fffe2b95f
Sec. 120-192. - Permit application.
Significant industrial users shall complete and file with the director a wastewater contribution permit application in the form prescribed by the director and shall certify its true accuracy and completeness in the manner and form specified in 40 CFR 403. In support of and with the application, the significant industrial user shall submit in units and terms appropriate for evaluation, the following: (1) Name, address and location, if different from the address, of the significant industrial user, including the name of the owner or operators. (2) SIC number according to the Standard Industrial Classification Manual, Office of Management and Budget, latest edition. (3) Wastewater constituents and characteristics including, but not limited to, those mentioned in sections 120-112 and 120-113 as determined by an approved laboratory. Sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to section 1204(g) of the act and contained in 40 CFR 136, as amended. (4) Time and duration of contribution. (5) Average daily and maximum wastewater flow rates, including daily, monthly and seasonal variations if any. (6) Site plans, floorplans, mechanical and plumbing plans and details to show all sewers, sewer connections and appurtenances thereto by size, location and elevation. (7) Description of activities, facilities and plant processes on the premises including all materials which are or could be discharged to the POTW. (8) The nature and concentration of any pollutants in the discharge which are limited by city, state or federal pretreatment standards, and a statement regarding whether or not the pretreatment standards are being met on a consistent basis, and if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the significant industrial user to meet pretreatment standards. The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this section. The sample shall be representative of daily operations and shall conform to sampling and analytical procedures and requirements as outlined in this section. (9) Each product produced by type, amount, process and rate of production, including daily, monthly and seasonal variations if any. (10) Type and amount of raw materials processed, average and maximum per day. (11) Number of employees, hours of plant operation and proposed or actual hours of operation of pretreatment system. (12) Such additional information as is deemed necessary or appropriate by the director in order to evaluate the permit application. The director may allow additional time, if necessary, in which to submit the additional information. (13) Any environmental control permits held by or for the facility. (14) Average and maximum daily volume flows to the POTW for each regulated process stream and other streams as necessary to use the combined wastestream formula of 40 CFR 403.6(e). (15) Monitoring requirements as specified in 40 CFR 403.12(b)(5). (16) Certification, by a qualified professional, indicating whether or not pretreatment standards are being met on a consistent basis, and if not, whether additional operation and maintenance and/or additional pretreatment is required. (17) Incomplete or inaccurate applications will not be processed and will be returned to the user for revision.
(G.O. No. 6488, § 1, 12-10-2018)
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.
