For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 36-1402 — Deletions, modifications, amendments, and additions

Code of the City of Springfield, Missouri (Supp. No. 23, Update 2: codified through G.O. No. 6973, enacted January 12, 2026) · Springfield, Mo., Land Development Code § 36-1402

Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/45902a53-efcc-471c-902e-9db4bea7e53f

Sec. 36-1402. - Deletions, modifications, amendments, and additions.

The 2018 International Fuel Gas Code, as adopted, is hereby amended and changed as follows: (a) Chapter 1 is repealed in its entirety because code enforcement is covered in Springfield City Code Chapter 36, Land Development Code, Article I, Administration and Enforcement of Codes and Article X, Uniform Enforcement Procedures. (b) Because Chapter 1 is repealed in its entirety, any cross references to Chapter 1 in subsequent chapters are replaced by the provisions in Article I that correspond, in content, to such cross references. (c) All adopted chapters and appendices include all errata hereafter published by the International Code Council after the date of the first printing of the 2018 International Fuel Gas Code. [(d)] [Amendments, additions, and deletions.] Section 301 (IFGC) General 301.11 Flood hazard. For structures located in flood-hazard areas, the appliance, equipment, and system installations regulated by this Code shall comply with Chapter 36, Article XVII, Floodplain Management, of the City Code. Section 401 (IFGC) General 401.5 Identification. All gas piping shall be identified by a yellow background marked "Gas" in black letters. Identification shall be in the form of a tag, stencil, or other permanent marking. Such identification shall be clearly and easily readable from the floor of the room of its location. Spacing on black steel pipe shall be at intervals of not more than 15 feet in concealed locations, 25 feet in exposed locations, and not less than once in any room space. Spacing for all other piping materials shall be at intervals not exceeding 5 feet and not less than once in any room space. Section 402 (IFGC) Pipe sizing Subsection 402.7 is repealed and replace with: 402.7 Operating pressure. The standard operating pressure for piping systems located inside buildings shall be 0.25 psig. Design operating pressures other than 0.25 psig shall only be allowed in areas where the gas supplier has sufficient main-line delivery pressure to assure adequate supply. The installer shall be responsible for verifying the availability of elevated pressure with the gas supplier. 402.7.1 Operating pressures of 2 psig or less. For operating pressures of 2 psig or less, the piping material shall be in conformance with Section 403 of the 2018 International Fuel Gas Code, as amended herein. 402.7.2 Pressures above 2 psig. Operating pressures above 2 psig shall only be allowed if all the following conditions are met: 1. Adequate pressure is available from the fuel-gas supplier; and, 2. The piping system is in an area zoned to allow commercial, industrial, or heavy manufacturing uses; 3. The connected load is 1000 CFH or greater and the facility has connected equipment that requires higher pressures for proper operation; 4. The installation is approved by the code official and the fuel-gas supplier; 5. The piping system is welded steel pipe; 6. All connected equipment is provided with regulators rated for the pressure provided. 402.7.3 Liquefied petroleum gas systems. The operating pressure for undiluted LP-gas systems shall not exceed 20 psig (140 kPa gauge). Buildings having systems designed to operate below -5°F (-21°C) or with butane or a propane-butane mix shall be designed to either accommodate liquid LP-gas or prevent LP-gas vapor from condensing into a liquid. These subsections are repealed in their entirety: a. 403.4.3 Copper and copper alloy. b. 403.5.3 Copper and copper alloy tubing. 404.2 CSST. CSST piping systems shall be installed in accordance with the terms of their approval, the conditions of listing, the manufacturer's instructions, requirements in administrative rulings, and this code. 404.9.1 Gas meter set connection. The gas-meter-set location and design shall be in accordance with the local gas operator's standards. 404.11.2 Protection methods. Underground piping shall comply with one or more of the following: 4. Buried steel piping shall be coated and insulated with insulating fittings or unions on both ends above grade outside the building within 6 inches to 18 inches above grade with a minimum of one-5lb magnesium anode installed for every 200 feet of buried pipe. Section 406 (IFGC) Inspection, Testing, and Purging 406.4.1 Test pressure and duration. The test on all gas piping designed for 2 PSIG and less, shall be made by closing all openings and subjecting the pipes to a minimum of 20 PSIG with a 15-minute duration. The test on all gas piping designed for greater than 2 PSIG shall be a minimum of 20 PSIG with 120-minute duration. The measurement range of the test gauge shall be from 0 to no more than 30 PSIG and shall be readily visible for reading. Subsection 406.4.2 Test duration is repealed in its entirety. 409.1.4 Shutoff valve support. All shutoff valves shall be supported in such a manner as to prevent movement of the valve body when the valve is operated. Connection of the valve to a section of iron pipe either immediately upstream or downstream of the valve shall be considered an acceptable support. 410.3.2 Vent termination. All regulator-relief vents terminating outdoors shall be provided with a manufactured termination fitting equipped with an internal stainless-steel screen. The termination point shall be a minimum of eighteen (18) inches above grade or roof surface. 411.1 Connecting appliances. Except as required by Section 411.1.1, appliances shall be connected to the piping system by one of the following: 2. Corrugated stainless-steel tubing (CSST) where installed in accordance with the manufacturer's instructions and with approval prior to design or installation. Installations with prior approval are listed and installation requirements are itemized by administrative ruling. 3. Semirigid metallic tubing and metallic fittings with approval prior to design or installation. Installations with prior approval are listed and installation requirements in administrative rulings. Lengths shall not exceed the length required for the installation or a maximum of 6 feet (1829 mm) and shall be located entirely in the same room as the appliance. Semirigid metallic tubing shall not enter a motor-operated appliance through an unprotected knockout opening. 4. Listed and labeled appliance connectors in compliance with ANSI Z21.24/CGA 6.10 and installed in accordance with manufacturer's instructions and located entirely in the same room as the appliance and with approval prior to design or installation. Installations with prior approval are listed and installation requirements are itemized by administrative ruling.

(Gen. Ord. 6559, § 1, 11-18-19)

Ask a question about Springfield law

Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.