§ 36-543 — Utility connections
Code of the City of Springfield, Missouri (Supp. No. 23, Update 2: codified through G.O. No. 6973, enacted January 12, 2026) · Springfield, Mo., Land Development Code § 36-543
Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/2be4fcfb-c7b3-4877-96eb-af533e3b1933
Sec. 36-543. - Utility connections.
Mechanical contractors may, when replacing an existing heating or cooling appliance with a new one, connect the new appliance back to the existing gas, water, and/or electric lines at the same points where the existing appliance was removed. Certified craftsmen in applicable trades must install any new gas, water, or electrical lines. In new construction, all utility connections must be made by certified craftsmen in the utility trades. Any utility installation necessary for equipment or units to function may be installed only with a permit.
(G.O. 6554, § 1, 11-18-19)
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.
