For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 36-543 — Utility connections

Code of the City of Springfield, Missouri (Supp. No. 23, Update 2: codified through G.O. No. 6973, enacted January 12, 2026) · Springfield, Mo., Land Development Code § 36-543

Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/2be4fcfb-c7b3-4877-96eb-af533e3b1933

Sec. 36-543. - Utility connections.

Mechanical contractors may, when replacing an existing heating or cooling appliance with a new one, connect the new appliance back to the existing gas, water, and/or electric lines at the same points where the existing appliance was removed. Certified craftsmen in applicable trades must install any new gas, water, or electrical lines. In new construction, all utility connections must be made by certified craftsmen in the utility trades. Any utility installation necessary for equipment or units to function may be installed only with a permit.

(G.O. 6554, § 1, 11-18-19)

Ask a question about Springfield law

Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.