§ 36-602 — Deletions, modifications, amendments, and additions
Code of the City of Springfield, Missouri (Supp. No. 23, Update 2: codified through G.O. No. 6973, enacted January 12, 2026) · Springfield, Mo., Land Development Code § 36-602
Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/395fd4ee-ed51-4742-9f16-5d8672c5e9f3
Sec. 36-602. - Deletions, modifications, amendments, and additions.
The 2018 International Building Code, as adopted, is hereby amended and changed as follows: (a) Chapter 1 is repealed in its entirety because code enforcement is covered in Springfield City Code Chapter 36, Land Development Code, Article I, Administration and Enforcement of Codes and Article X, Uniform Enforcement Procedures. (b) Because Chapter 1 is repealed in its entirety, any cross references to Chapter 1 in subsequent chapters are replaced by the provisions in Article I that correspond, in content, to such cross references. (c) All adopted chapters and appendices include all errata hereafter published by the International Code Council after the date of the first printing of the 2018 International Building Code. [(d)] [Amendments, additions, and deletions.] 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. The assigned address number shall be clearly posted on the site immediately after the date of issuance of the permit and shall remain in place until the building is removed from that site. Letters or numbers shall be in conformance with Chapter 26, Section 26-3, Numbering of businesses and dwellings units, of the Springfield City Code. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. 503.1.5 Clearance Requirements. All buildings and structures are required to meet clearance requirements from all wires, conductors, cables, and rigid live parts as stipulated in the National Electric Safety Code (NESC), latest edition, or as dictated by the utility service provider. In case of a conflict between the two agencies, the more stringent shall apply. 903.6 Post Indicating Valves: Post Indicating Valves may be omitted when a fire service connection to the public water supply main is provided and controlled by the utility purveyor. 912.4.1 Locking fire department connection caps. All fire department connections shall be provided with KNOX FDC Caps. 1004.9 Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space for the intended configurations. At the main entrance to the building, the occupant load for the entire assembly use group shall be posted in a conspicuous place. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or the owner's authorized agent. 1010.1.9.2 Hardware height. Door handles, pulls, latches, locks and other operating devices shall be installed 34 inches (864 mm) minimum and 48 inches (1219 mm) maximum above the finished floor. 1301.1.1 Criteria. Buildings shall be designed and constructed in accordance with the 2012 International Energy Conservation Code. Section 1603 Construction Documents 8. Design base shear(s) for new structures and structure additions. (Note: All other items listed shall remain as written.) 1608.1 General. Design snow loads shall be determined in accordance with Chapter 7 of ASCE 7, but not less than 20 psf and the design roof load shall not be less than that determined by Section 1607. A reduction in snow loads shall not be permitted. Subsection 1608.2, ground snow loads, is repealed in its entirety and replaced with: 1608.2 Ground Snow Load. The ground snow load to be used in determining the design snow loads for roofs shall not be less than 20 psf. Subsection 1612.3 Establishment of flood hazard areas, is repealed in its entirety replaced with: 1612.3 Establishment of flood hazard areas. Flood hazard areas shall be as stipulated in Chapter 36, Article VII, of the Springfield City Code. Section 1704. Special Inspections and Tests, Contractor Responsibility and Structural Observation 1704.2.4 Report requirement. Approved agencies shall keep records of special inspections and tests. The approved agency shall submit reports of special inspections and tests to the building official Reports of special inspections and tests associated with a discrepancy shall be submitted to the building official within a week of performance of the special inspection or test and until correction of the discrepancy has been confirmed in writing on a special inspection report or by other written correspondence, except as provided below. Reports of special inspections and tests shall be submitted to the building official or the building official's duly authorized representative upon request. Reports of special inspections and tests shall be submitted to the building official by uploading to the project file using the e-Plans or ProjectDox system, unless otherwise approved by the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected or tested was or was not completed in conformance to approved construction documents. Unless approved otherwise in writing by the building official, approved construction documents are those approved in writing or electronically by the building official. Discrepancies shall be brought to the immediate attention of the contractor for correction. If they are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and tests, and correction of any discrepancies noted in the inspections or tests, shall be submitted prior to issuance of a Certificate of Occupancy. Exception: The approved special inspection agencies procedures for documenting special inspection results and tracking discrepancy resolution may be allowed in lieu of the above procedure, subject to review and approval by the building official. 1705.17 Fire-resistant penetrations and joints. In high-rise buildings or in buildings assigned to Risk Category III or IV, special inspections tor through-penetrations, membrane penetration firestops, fire-resistant joint systems and perimeter fire barrier systems that are tested and listed in accordance with Sections 714.4.1.2, 714.5.1.2, 715.3 and 715.4 shall be in accordance with Section 1705.17.1 or 1705.17.2. 1809.5 Frost Protection. Except where otherwise protected from frost, foundation walls, piers, and other permanent supports or buildings and structures shall be protected from frost by one of the following methods: 1. Extending below the frost line, established at 24 inches for the City of Springfield, Missouri; 2. Constructing in accordance with ASCE-32; 3. Erecting on solid rock. Exceptions: Freestanding buildings meeting all of the following conditions shall not be required to be protected: 1. Assigned to Risk Category I; 2. Area of 600 square feet (56 sq. meters) or less for light-frame construction or 400 square feet (37 sq. meters) or less for other than light-frame construction; or 3. Eave height of 10 feet (3048 mm) or less. Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. 3103.1.2 Permit required. Temporary structures that cover an area in excess of 100 square feet (9.3 square meters), including connecting areas or spaces with a common means of egress or entrance that are used or intended to be used for the gathering together of 10 or more persons, shall not be erected, operated or maintained for any purpose without obtaining a permit from the fire official. 3107.1 General. Signs shall be designed, constructed, and maintained in accordance with all applicable sections of this code and Chapter 36, Article III, of the Springfield City Code. In the event of a conflict, the stricter provisions shall apply. 3201.1 Scope. The provisions of this chapter, and Chapter 98 and the Land Development Code of the Springfield City Code, and other provisions of this code, shall govern the encroachment of structures into the public right-of-way. In case of a conflict, the stricter provisions shall apply. All cross references to the International Zoning Code shall instead cross refer to the appropriate section of Article III. - Zoning Regulations.of Chapter 36 of the Springfield City Code, known as the Land Development Code. The NFPA 520 Standard on Subterranean Spaces, latest edition, is hereby incorporated into the International Building Code Referenced Standards.
(Gen. Ord. 6555, § 1, 11-18-19)
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.