For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 96-19 — Sinkhole permit

Code of the City of Springfield, Missouri (Supp. No. 23, Update 2: codified through G.O. No. 6973, enacted January 12, 2026) · Springfield, Mo., City Code § 96-19

Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/e7e6641d-8664-4d5a-aa40-29b622979301

Sec. 96-19. - Sinkhole permit.

(a) A sinkhole permit is required pursuant the flood control and water quality protection manual and any applicable provisions of this article. Upon review of the information presented by the applicant, the site, and such other information as may be available, the director of public works may issue a permit for work to be performed in the sinkhole area. All work shall be performed in accordance with the permit, the flood control and water quality protection manual, and any applicable provisions of this article. (b) In addition to establishing a plan for grading and use of construction equipment, the director of public works may, based upon the topography, geology, soils, and history of the sinkhole, such as past filling, and the developer's engineer's stormwater analysis and plan, establish sinkhole-related non-buildable areas. No buildings, parking areas, grading or other structures shall be permitted within the sinkhole-related non-buildable area. (c) The non-buildable area shall generally follow the limits of the sinkhole. However, the non-buildable area may be expanded or contracted by action of the director where warranted, due to the nature of the specific sinkhole, the underlying geology, soils, drainage, and any related information, such as depth to bedrock. In sinkhole cluster areas, the director of public works may require the developer to provide recommendations from a consulting engineer and a consulting hydrogeologist, based upon substantial and state-of-the-art field studies and evaluation of the specific sinkhole system. Such studies shall be submitted to the director of public works. (d) No principal or accessory buildings with soil-bearing foundations shall be permitted to be constructed on fill within the limits of any sinkhole unless approved by the director of building development services.

(G.O. No. 6445, § 1, 4-9-2018)

Ask a question about Springfield law

Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.