§ 98-118 — General access standards
Code of the City of Springfield, Missouri (Supp. No. 23, Update 2: codified through G.O. No. 6973, enacted January 12, 2026) · Springfield, Mo., City Code § 98-118
Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/da14dac4-b2fb-4fae-8581-e0c8d28fae59
Sec. 98-118. - General access standards.
(a) Any permittee or other person who shall construct, reconstruct, alter, remove, or replace any driveway shall bring the driveway into full compliance with all portions of this division and any other applicable requirements of the subdivision and zoning regulations, any site plan, access plan, zoning requirements, and the public works design standards and technical specifications. (b) Access to city streets is regulated by this division. When requirements of this division may not be directly applicable to a specific application, the director shall be authorized to permit, remove, or define access locations as per section 98-111. (c) This division primarily provides regulations on the location of access points only. Specific requirements related to materials, cross sections, grades, and other design details are found in the public works design standards and technical specifications. (d) Variances for access spacing requirements may be requested in accordance with section 98-121 of the City Code. (e) Access spacing shall be as provided herein. (f) Corner clearance. Corner clearance requirements for driveways along a divided roadway can be assumed to be right-in/right-out access types. If the findings of a traffic impact study indicate that the functional area of a signalized intersection extend beyond the values shown in table below, the city traffic engineer may require a larger clearance and/or restrict left-turn movements at a driveway within the functional area. Classification | Driveway Location on Roadway from Intersection | Minimum Clearance Along an Undivided Roadway (ft) | Minimum Clearance Along a Divided Roadway (ft) Expressway | Upstream | 660 | 660 Downstream | 660 | 660 Arterial | Upstream | 550 | 275 Downstream | 550 | 275 Collector | Upstream | 275 | 140 Downstream | 275 | 140 Local | Upstream | 100 | 50 Downstream | 100 | 50 (g) Corridor characteristics. Corridor characteristics define the components of the public roadway that can dictate the location and access types available to driveways. Classification | Subclassification | Driveway Spacing (ft)1 Full Access | Right In/Out Expressway | 660 | 660 Arterial | Arterial—High Type | 440 | 220 Arterial—Mid Type | 440 | 220 Arterial—Low Type | 330 | 220 Collector | Collector—System | 220 | 150 Collector—Residential Subdivision | 130 | NA Collector—Residential Subdivision (Pre-2026) | 100 | NA Local | Local—High Activity | 100 | NA Local—Low Activity | 50 | NA 1 Access shall not be located within the functional area of an intersection. (h) Number of access points. The use of shared or cross access between adjacent properties reduce the number of conflict points and separate conflict areas. Providing a common access can be encouraged by offering a full access driveway, such as along a raised median creating a median opening, if it can be shown that spacing allows and customer convenience and safety is improved. With redevelopment properties under single ownership, joint access should be recommended before subdivision. Classification | Subclassification | Maximum Number of Driveways* Full Access | Right-In/Out Arterial | Arterial—High Type | 1 | 1 Arterial—Mid Type | 1 | +1 Arterial—Low Type | 1 | +1 Collector | Collector—System | 1 | +1 Collector—Residential Subdivision | ** | NA Collector—Residential Subdivision (Pre-2026) | 2 * | NA Local | Local—High Activity | 2 * | NA Local—Low Activity | 1/Lot | NA * Values in the table indicate the maximum number of access points. Access locations must meet the offset requirements noted in tables above. Residential single-family lots shall have no more than one access. ** Direct access to residential subdivision collectors should be minimized but where allowed shall be a maximum of one per lot, or a maximum 20 percent of lots that abut the road total of both sides. _____ (i) Access requirements and triggers for application. any development, rezoning, redevelopment, change in use, building permit, site plan, or subdivision shall have access to public streets or alleys that complies to all requirements of this chapter, chapter 98, public works design standards and technical specifications, and any other applicable requirements. Additional triggers, applicability, and exceptions for driveway and access requirements are noted herein. (1) General. a. If an existing lot requires new access that cannot meet all current requirements, and an alternate access does not exist, the access point shall be placed at the most reasonable location as determined by the city traffic engineer and a cross access easement must be provided across the entire length of the lot as necessary to provide access to adjacent lots considering development patterns, terrain, and safe ingress/egress. b. If the proposed development, rezoning, redevelopment, change in use, building permit, site plan, subdivision, or other development activity requires a driveway safety study, traffic impact study, or has the potential to produce public safety risk as determined by the city traffic engineer, modifications may be required to the access including but not limited to restricting directional access or other public improvements. Any existing, non-compliant access point must be removed at the appropriate time as determined by the city traffic engineer if not specifically defined elsewhere. (2) Administrative subdivisions. All administrative subdivisions shall have access points to public streets or alleys that fully comply to the current standards or will fully comply when developed as determined by the access plan for each new lot. Administrative subdivisions creating new R-SF lots with residential uses may have non-compliant access points as per subsection (i)(4)b. of this section. (3) Existing access. If a lot has an existing access, the existing access may remain but shall be corrected, removed, or reconstructed prior to issuance of the certificate of occupancy and/or final approval of the subdivision activity when any of the following occurs: a. When a site plan, public improvement plans, or driveway permits are required. b. When any access is within the functional area of an intersection or deemed a public safety risk by the city traffic engineer. c. A change in use or rezoning occurs that produces additional traffic volume to warrant a driveway safety study or traffic impact analysis that identifies required corrections to the access. (4) Access for residential single-family lots. a. With a new building permit. If an existing lot cannot accommodate an access meeting all requirements and alternate access does not exist, the access point shall be placed at the most reasonable location as determined by the city traffic engineer. No shared access or cross access easements are required for an existing individual residential single-family lot on a residential collector street or below. b. Existing access with subdivision activity. When an existing lot is subdivided to create new legal lots for single-family residential uses, an existing access for residential single-family may remain if the existing access is on a street classified as a residential collector or below, is not within 50 feet of an arterial street, or poses no public safety risk as determined by the city traffic engineer. If within 50 feet of an arterial or deemed a safety risk, the access plan will be required to analyze future shared access, cross access easements, and/or applicability of removal or modification of current access points. If the existing access requires modification, any change in access will need to be escrowed or constructed prior to approval of the subdivision activity. (5) Permitting and requirements. A driveway permit is required to be issued by the PW director prior to the creation of or modification of any access point. If Public Improvement Plans (PIP) are required, access will be required to be shown on the plans and if so shall be completed or escrowed in cooperation with the PIP plan prior to approval of the subdivision activity or building permit. Any driveway will need to be fully constructed, and final inspection completed prior to issuance of the Certificate of Occupancy (CO) or Temporary Certificate of Occupancy (TCO). (j) Storage and queueing. Storage requirements shown below are on a per-tenant basis with the intent that the queues do not spill onto the public roadway or block egress/ingress to properties. The city traffic engineer may request tenant-specific queueing, including schools, and trip data and modify the requirements as necessary to prevent queuing of traffic onto a public street or rights-of-way. Facility Type | Vehicle Storage Drive-in Bank | 6 spaces per window Drive-in Restaurant | 10 spaces per window 1 Automatic Car Wash | 10 spaces per wash line Self-Service Car Wash | 3 spaces per wash line Drive-in Theater | 15% of the total parking capacity Service Stations | 4 spaces per service position Drive-in Liquor Store | 3 spaces per window 1 1 Measured from the pick-up window.
(G.O. No. 6973, § 1(Exh. 1), 1-12-2026)
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.
