Sec. 98-285. - Installation of lift stations and force mains by private developers.
(a) Purpose. This section is intended to ensure to the extent possible that the operating cost of lift stations and force mains will not be subsidized by users of the sewer system who are outside the area served by the force main and lift station. Due to the higher operating costs and the environmental problems that can occur with the operation of lift stations and force mains, the city has determined that construction of such facilities should occur under the limited circumstances described in this section. (b) Definitions. For purposes of this section, the following definitions shall apply: Difference in cost means the ten-year fixed cost plus the ten-year variable cost to operate the lift station and force main, plus the incremental cost to construct gravity sewers. Incremental cost to construct gravity sewers means the cost per square foot which needs to be collected so that after ten years sufficient funds are available to build gravity sewers to replace the lift station and force main multiplied times the number of square feet served by the proposed lift station and force main. Ten-year fixed cost means the cost to check and repair a lift station for a ten-year period. Ten-year variable cost means the average utility cost for a ten-year period per square foot times the number of square feet served by the proposed lift station and force main. (c) Apportionment of costs. If the city finds the cost to install a gravity sewer is less than the cost to install the lift station and force main plus the difference in cost, then the gravity sewer shall be constructed at the cost of the developer. If, however, the city finds the cost to install the gravity sewer is greater than the cost to install the lift station and force main plus the difference in cost, then the city may decide to pay the developer the difference and require the developer to install the gravity sewer. If the city decides not to pay the additional cost for installation of the gravity sewer, the city may allow the developer to install gravity sewers or install the lift station and force main. If the developer elects to install the lift station and force main, then the developer shall pay the city the difference in cost. (d) Connection to existing lift stations. A request by a property owner or developer to connect a new development to a sewer system served by an existing lift station will be reviewed by the city on a case-by-case basis. The city will not allow a new development to connect to a lift station unless there is sufficient capacity in the lift station and force main to serve the additional property or unless the developer increases the capacity of the lift station and force main in an amount sufficient to serve the new property as determined by the city. If the city finds the cost to install a gravity sewer is less than the cost to expand the lift station and force main plus the ten-year variable cost and the incremental cost to construct gravity sewers as adjusted by the construction cost index, then the gravity sewer shall be constructed at the cost of the developer. If, however, the city finds the cost to install the gravity sewer is greater than the cost computed pursuant to the previous sentence, then the city may decide to pay the developer the difference and require the developer to install the gravity sewer. If the city decides not to pay the additional cost for installation of the gravity sewer, the city may allow the developer to install gravity sewers or connect to an existing lift station and force main and expand such lift station and force main if necessary. If the developer elects to connect to the existing lift station and force main, then the developer shall pay the city the ten-year variable cost, plus the incremental cost to construct gravity sewers as adjusted by the construction cost index. These additional fees shall not be assessed for any existing subdivisions which are served by existing lift stations. Fees also shall not be assessed for existing subdivisions under development in phases where the lift station and force main now serving the subdivisions were planned to serve all phases of the development. Nothing contained in this subsection shall be construed to prohibit the city from entering into a contract with a developer which allows the developer to recover a reasonable portion of the developer's ten-year fixed cost from third parties who are developing outside the sewer district and want to connect to the lift station and force main." (e) Calculation of Lift station difference in cost. The following amounts will be used in the calculation to determine the cost of a lift station in the comparison analysis. Each of these costs are based on December 2017 values and must be adjusted to present-day values using the Engineering News-Record (ENR) Construction Cost Index. As of December 2017, the base value of the ENR Construction Cost Index is 10873. (1) The "ten year fixed cost" is $92,250.00. (2) The "ten year variable cost" is 1.7 cents per square foot of property proposed to be served or $265.00 per proposed dwelling unit for a low density residential development (less than 2.8 dwelling units per acre) or $90.00 per population equivalent (projected average daily discharge/100 GPD) for a non-residential development whichever is least. (3) The "incremental cost to construct gravity sewers" is 3.77 cents per square foot of property proposed to be served. (f) Prohibition against certain lift stations. Notwithstanding any other provision of the city to the contrary, lift stations will not be considered acceptable where overflows of raw sewage from the lift station would flow into environmentally sensitive areas such as sinkholes, losing streams, spring recharge areas, public water supplies or other environmentally sensitive areas, except where additional design and construction features of the lift station overcome environmental concerns to the satisfaction of the director of environmental services. (g) Exchange of equipment. If a developer is allowed by the city to expand the capacity of a lift station and this expansion requires the replacement by the developer of the existing emergency generator, or motors, or pumps or other equipment, upon the replacement of such equipment with the new equipment approved by the city, and the installation of the equipment at developer's expense and dedication of the equipment to the city, the developer may remove and retain any equipment which the developer has replaced, for developer's own use, "AS IS", without any warranties by the city, express or implied. Developer shall furnish satisfactory proof to the city of payment of all labor and materials in connection with the acquisition and installation of new equipment, and the removal of existing equipment.
(Code 1981, § 19-60.1; G.O. No. 4544, § 1, 8-21-1995; G.O. No. 5063, § 1, 3-19-2001; G.O. No. 5947, § 9, 8-22-2011; G.O. No. 6479, § 1, 11-5-2018)