§ 2-1152 — Street priority methodology plan for unimproved streets
Code of Ordinances of the City of St. Joseph, Missouri (Codified through Ordinance No. 3140, enacted February 2, 2026. (Supp. No. 8)) · St. Joseph Code of Ordinances § 2-1152
Corpus is an independent public-information project, not the official City of St. Joseph website. Stable reference: corpuslaw.us/code/50e959b1-72cd-43cd-a500-3166c35319b9
Sec. 2-1152. - Street priority methodology plan for unimproved streets.
The city street priority methodology plan for unimproved streets shall be arrived at by using the following methods: (1) Evaluation categories generally. Evaluation Category | Maximum Points Per Category Actual use of street | 15 Classification of street | 15 Density | 10 Existing surface | 10 Connector route | 5 Traffic count | 10 Zoning | 5 Existing utilities | 10 Street design complete | 5 Right-of-way availability | 5 Developmental potential | 10 Total | 100 (2) Actual use of street: The actual use of the street as arterial, collector or residential. Arterial | 15 Collector | 10 Residential | 5 (3) Classification of street: The official classification of the street as determined by ordinance as arterial, collector or residential. Arterial | 15 Collector | 10 Residential | 5 (4) Density: The number of houses for each 100 feet of street. This can be taken from aerial photographs: 4—5 | 10 3—4 | 8 2—3 | 6 1—2 | 4 0—1 | 2 (5) Existing surface: The actual street surface, ranging from dirt to three-inch asphalt. Dirt | 10 Gravel | 8 Dust Control | 6 Rock & Oil | 4 3" Asphalt | 2 (6) Connector route: Is the street a vital connection between two major routes? Yes | 5 No | 0 (7) Traffic count (ADT): The average daily traffic count using the 1986 traffic volume map. If current actual counts are not available, use the number of residences times ten. Over 949 | 10 850—949 | 9 750—849 | 8 650—749 | 7 550—649 | 6 450—549 | 5 350—449 | 4 250—349 | 3 150—249 | 2 0—149 | 1 (8) Zoning: Based on the current land use. Industrial | 5 Commercial | 4 Residential | 3 Agricultural | 1 (9) Existing utilities: Based on the existing water, sewer and gas availability. Existing Utilities | +10 No Gas | -2 No Water | -3 No Sewer | -5 (10) Street design complete: Based on the percentage of the design completed. Use the percentage complete divided by 20. Example: 100% ÷ 20 = 5. (11) Right-of-way availability: Based on the present right-of-way width, or the ability to obtain the additional right-of-way. Over 60' | 5 51—60' | 4 41—50' | 3 21—40' | 2 0—20' | 1 (12) Development potential: The abutting properties' potential for development. Very good | 10 Good | 8 Fair/good | 6 Fair | 4 Poor | 2
(Gen. Ord. No. 1023, § 1(8-159), 10-12-92)
Ask a question about St. Joseph law
Corpus searches the St. Joseph sections it holds and shows the ones that match, with their citations. Free, no sign-in.
