Sec. 25-104. - Refilling.
(a) Notice required. The person making a cut or excavation in, through or under any street, alley, sidewalk, parkway, boulevard or public place in the city shall notify the department of public works and transportation of his intention to commence the refill of the cut or excavation at least four hours prior to the actual commencing thereof. However, if the city or its authorized contractor is to refill the cut or excavation, he shall notify the department of public works and transportation or the department of parks and recreation, as the case may be, when the excavation is ready for filling. (b) Standards prescribed. The filling of all cuts or excavations made in any street, alley, sidewalk, parkway, boulevard or public place in the city shall be in accordance with the plans and specifications on file in the office of the director of public works and transportation, a copy of which is attached to and made a part of the required permit. (c) Unsatisfactory refill. If, at the inspection prior to repaving, the department of public works and transportation, or one of its street inspectors, determines that the refill is not satisfactory, it shall have the right to take out all of the filled material from the excavation and have the excavation refilled at the expense of the person to whom the permit was issued and charge the cost thereof against such person. (d) Authority of city. The city may notify the person at the time the permit is issued that the city or its authorized contractor will refill the cut or excavation. In such event the permit holder shall reimburse the city for the cost thereof, as established by a schedule for doing the work and the payment of the charges. (e) Removal of waste, debris. The person making such refill shall be required to clean up and haul away all surplus earth, rock or rubbish immediately after the refill has been completed. For a default thereof, the city or its authorized contractor shall have the right to remove the earth, rock or rubbish and charge the cost of such removal against the person to whom the permit was issued. (f) Repairs by city. If settlement due to defective refill occurs after the completion of repaving, the city or its authorized contractor shall have the right to make whatever repairs are required to restore the excavation and repaving to a proper condition and to charge the cost thereof against the person to whom the permit was issued.
(Code 1969, § 19-79; G.O. 1950, 6-9-03)
Ask a question about St. Joseph law
Corpus searches the St. Joseph sections it holds and shows the ones that match, with their citations. Free, no sign-in.