§ 26-74 — Construction of improvements
Code of Ordinances of the City of St. Joseph, Missouri (Codified through Ordinance No. 3140, enacted February 2, 2026. (Supp. No. 8)) · St. Joseph Code of Ordinances § 26-74
Corpus is an independent public-information project, not the official City of St. Joseph website. Stable reference: corpuslaw.us/code/f713e271-a6a3-45a8-9c7a-ce4bd17095d6
Sec. 26-74. - Construction of improvements.
(a) Construction plans. (1) Following approval of the preliminary plat, the applicant shall have prepared, by a professional engineer, architect or land surveyor registered in the State of Missouri, construction plans, consisting of complete construction drawings of all easements, streets, street lights, sanitary sewers, storm water facilities, water system facilities, sidewalks and other improvements as are required by the director of public works and transportation, including specifications, for that portion of the subdivision to be covered by the final plat. Construction plans shall be submitted to the director of public works and transportation for review and approval. (2) All improvements required pursuant to these regulations shall be constructed in accordance with the design standards and plan requirements of these regulations, the standards and specifications of the city and, where applicable, the requirements and authorization of the appropriate state agency, utility company or local franchisee. (3) Public utility companies that service the subdivision shall provide a construction plan for the utility being installed to the director of public works and transportation and transportation prior to construction. The plans should be submitted prior to, or at the same time as, the construction plans submitted by the subdivider. (b) Completion of sidewalks. It shall be the responsibility of the developer and/or owner of record of undeveloped lots to complete all sidewalks after three years of initial construction, the owner of record of the undeveloped lots shall provide additional approved surety to extend the timeline of completion of the sidewalks an additional two years, not to exceed five years from the recordation of the final plat. The right-of-way shall be graded and compacted per city standards and Section 26-103 of this chapter on each side of the street in preparation for installation of five foot wide concrete sidewalks. Concrete shall be placed on the base at the time that individual homes are constructed or at the end of the initial three year period, or at the end of the maximum five year extended period, with proper approved surety, from when the final plat is recorded, whichever occurs first. The developer of record shall be responsible for the completion of sidewalks adjacent to any open space or common area at the time of the construction of street improvements. (c) Construction plan requirements. (1) General. The construction plan shall be prepared by a professional engineer, architect or land surveyor registered in the State of Missouri. Five copies of the construction plan shall be submitted to the director of public works for review. The construction plan shall be at any scale from one inch equals ten feet (1" = 10') through one inch equals one hundred feet (1" = 100'), so long as the scale is an increment of ten feet and is sufficiently clear in reflecting details of the proposed construction. Construction plans shall be prepared on 24" x 36" sheets. The preliminary plat or title page shall be used as the cover sheet for the construction plan. The plan shall generally consist of the following: a. The preliminary plat for the project drawn on the existing topographic survey of the property. b. Roadway construction plan, profile and detail sheets. c. Sanitary sewer system construction plan, profile and detail sheets. d. Storm water management plan showing plan and profile of storm sewer and drainage facilities, detail sheets, hydrological and hydraulic calculations and other information as required by the director of public works and transportation. e. Proposed grading cross sections and final contours in critical drainage areas. f. Water distribution system construction plan and details. Each of the above items shall be shown on separate sheets. (2) Roadway construction detail sheets. All construction details pertaining to the roadway improvements (e.g., pavement details, pavement width, curbing, sidewalk, unpaved areas, entrances, lighting, etc.) shall be shown on typical section and in plan and profile. Specific details shall include, but not be limited to: a. Pavement installation, widening or resurfacing improvements dimensioned and developed in accordance with the standards available from the department of public works and transportation; b. Pavement widening and resurfacing improvements in the right-of-way as measured from the centerline; c. Mathematical profile grade and elevations at 25 feet intervals on vertical curves and 50 feet intervals on tangent sections for all roadway construction. Elevations at quarter point intervals along pavement edge at street intersection corners; d. Resurfacing profile grade elevations on existing centerline and edges of pavement at 25 feet intervals and breaks in grade (i.e., irregularities in pavement); e. Jointing plan and details for Portland cement concrete pavement; and f. Type and location of entrance construction. (3) Sanitary sewer, storm drainage and water line plan and profile sheets. All construction details pertaining to the sanitary sewerage, storm drainage and water distribution system improvements shall be prepared in accordance with all requirements of these regulations and other pertinent city regulations and standards and shall be shown in plan and profile. With the approval of the public works and transportation director, profiles may be omitted from water distribution system drawings. Specific details shall include, but shall not be limited to: a. Existing ground and finished grade shown and designated; b. Methods to be used in repairing open trenching of pavement; c. Limits of backfill and pavement replacement at all crossings of existing roadway surfaces not bored; d. Location of all utilities to be encountered in construction. Plans must be submitted to all utilities for verification of conflicts. Contact the public works and transportation director regarding all major utility conflicts within road rights-of-way; and e. Proof of plan approval by any other political subdivisions having jurisdiction over any aspect of the proposed development must be received prior to construction plan approval. (4) Grading plan and cross section sheets. A grading plan for the entire tract within the preliminary plat shall be provided. All grading details pertaining to site development shall be shown in plan or on cross section sheets. Specific details shall include, but shall not be limited to: a. Existing and proposed contours, normally at two-foot intervals, in critical drainage areas. Contour intervals for grading plans other than the above will require special approval. b. Site grading shall be compatible with ultimate roadway elevations. c. Where required by the director of public works and transportation, cross sections showing existing ground and finished grades plotted at scale of not less than one inch equals one hundred feet (1" = 100') horizontal and one inch equals ten feet (1" = 10') vertical. (d) Construction schedule. Prior to submitting the construction plans to the director of public works and transportation, the applicant shall submit the construction plans to all applicable reviewing agencies and to the public utility companies that will service the subdivision and shall create a general schedule of the timing and sequence of construction for all required improvements which shall be submitted to the director of public works and transportation. (e) Timing of improvements. Except upon the written approval of the director of public works and transportation, no grading, removal of trees or other vegetation, land filling, construction of improvements or other material change, except for purposes of aiding in preparation of final engineering drawings or plans, shall commence on the subject property until the applicant has: (1) Entered into a subdivision improvement agreement with the city for completion of all required improvements; (2) Received approval of the construction plans and all necessary permits from the director of public works and transportation; and (3) Obtained necessary approvals and permits from other affected municipal, county or state agencies. (f) Modification of construction plans. All installations of improvements and all construction shall conform to the approved construction plans. If the applicant chooses to make minor modifications in design and/or specifications during construction, such changes shall be made at the applicant's own risk, but only with the written approval of the director of public works and transportation. It shall be the responsibility of the applicant to notify the director of public works and transportation in advance of any changes to be made from the approved drawings. In the event that actual construction work varies from that shown on the approved construction plans and such variance was not approved in advance by the director of public works and transportation, the applicant may be required to correct the installed improvements so as to conform to the approved construction plans. In addition, the city may take such other actions as may be deemed appropriate including, but not limited to, revocation of plat approval and/or permits already issued and/or withholding of future approvals and permits. (g) Record drawings. (1) Prior to final inspection of the required improvements, the applicant shall submit to the director of public works and transportation one reproducible copy and two prints of record engineering drawings for each of the required improvements that has been completed. Each set of drawings shall be recertified by the applicant's engineer indicating the date when the record survey was made. (2) Sewer and storm drainage. Record drawings shall show the constructed vertical elevation, horizontal location and size of all sanitary and storm sewers, manholes, inlets, junction boxes, detention basins and other appurtenances or elements of the sewerage and storm drainage systems constructed to serve the subdivision. (3) Streets and street lights. Unless otherwise required by the director of public works and transportation, record drawings for roadways or street improvements shall be limited to a survey of the street centerline, with final profile elevations recorded on the drawings at 100-foot intervals, plus the notation of changes in horizontal alignment or intersection geometrics which may have been made during construction, and the location of street lights. (4) Water. Record drawings for water lines, valves, fire hydrants and other appurtenances or elements of the water distribution system constructed to serve the project shall be limited to horizontal location and size of water lines and location and description of valves with dimensional ties as may be required by the director of public works and transportation. (5) Sidewalks. Record drawings showing location with respect to the street right-of-way, width and vertical elevation. (h) Inspection and acceptance of improvements. (1) Required. All improvements required by these regulations shall be inspected by the director of public works and transportation or his designee, except for improvements made under the jurisdiction of other public agencies, in which case engineers or inspectors of such agency will make the necessary inspections. Where inspections are made by other agencies, the applicant shall provide the city with written reports of each final inspection. (2) Inspection schedule. It shall be the responsibility of the applicant to notify the director of public works and transportation of the commencement of construction of improvements 24 hours prior thereto. (3) Compliance with standards. The applicant or the bonded construction contractor shall bear full and final responsibility for the installation and construction of all required improvements according to the provisions of these regulations and the standards and specifications of other public agencies. (4) Inspection. All construction within a proposed or existing public right-of-way must be inspected during construction and prior to final acceptance of the improvements. The developer has two options for inspection services: a. The developer will provide inspection services per the requirements set by the director of public works and transportation, per Section 25-90; or b. The city will provide the service through contracted consulting engineer(s) and the costs of said inspections, testing and reporting shall be paid by the developer to the city. (5) Acceptance. a. Approval of the installation and construction of improvements by the director of public works and transportation shall not constitute acceptance by the city of the improvement for dedication purposes. Such acceptance shall be made only by ordinance adopted by the council, if deemed appropriate. b. The city shall not have any responsibility with respect to any street or other improvement, notwithstanding the use of the same by the public, unless the street or other improvements shall have been accepted by ordinance by the council. c. When improvements have been constructed in accordance with the requirements and conditions of these regulations and the specifications of the city, and the applicant has submitted as-built reproducibles to the director of public works and transportation, the director shall submit to the council, within 30 days, an ordinance to accept the improvements for maintenance by the city, except that this shall not apply to sewers which are not in an established sewer district. d. Upon the receipt by the council of a proposed ordinance accepting the improvements, as prepared by the director of public works and transportation certifying that all improvements have been installed in conformance with the approved construction plans and with the requirements of these regulations and all other applicable statutes, ordinances and regulations, the council shall formally accept such improvements. (6) Site cleanup. The applicant shall be responsible for removal of all equipment, material, dirt, gravel, straw and general construction debris from the subdivision and from any lot, street, public way or property therein or adjacent thereto. Dumping of such debris into sewers, onto adjacent property or onto other land in the city is prohibited.
(Code 1969, §§ 20-17—20-19; G.O. 1264, 2-13-95; G.O. 1438, 7-29-96; G.O. 1766, 5-15-00; G.O. 2041, 8-30-04; G.O. 2301, 10-6-08)
Ask a question about St. Joseph law
Corpus searches the St. Joseph sections it holds and shows the ones that match, with their citations. Free, no sign-in.