§ 29-278 — Construction and inspection of facilities

Code of Ordinances of the City of St. Joseph, Missouri (Codified through Ordinance No. 3140, enacted February 2, 2026. (Supp. No. 8)) · St. Joseph Code of Ordinances § 29-278

Corpus is an independent public-information project, not the official City of St. Joseph website. Stable reference: corpuslaw.us/code/ff7a0a8c-872e-4c5a-bbf0-b4d8176e2eb8

Sec. 29-278. - Construction and inspection of facilities.

(a) The prior, written consent of the city is required for any new construction of any trunk or collection line that extends additional service for a new connection, or any service line extension to properties not abutting or encompassing the existing and approved sewer collection system, or for any other extension of services which otherwise increases the flow from the entity's sewage system. Any such extension of the entity system shall be requested of the city in advance and shall not be approved without the express, written consent of the city. Unapproved extensions shall in no way obligate the city to convey or treat subsequent flow and shall constitute a conscious act of the entity to plan, construct and operate its own collection and treatment system, diverting unauthorized flow from the city to systems for which the entity is solely responsible for funding and maintaining. (b) A sewer connection permit issued by the city shall be required prior to any and all connections to the entity's sewage collection system. The city shall charge a fee for each approved sewer connection permit issued by the city as provided in the code, payable to the city prior to the issuance of the permit. The city reserves the right to deny any permit for non-compliance with any of the requirements of this Code and to take any action the city deems necessary to prevent connection of sewers prior to compliance with the code including, but not limited to, terminating a sewer service subscription agreement with the entity or otherwise terminating sewage transportation and treatment service to the entity. Prior to the issuance of a sewer connection permit by the city, the entity shall be required to have previously established an approved sewer district for the area in or for which the connection is to be made. The face of the building permit issued for the property for which the sewer connection permit is sought must include a notation which shall designate the sewer district in which the connection is to be made. (c) The entity shall notify each applicant for a building permit that the city will also require that a plumbing permit for a sewer connection be obtained from the city for the inspection of the sewer connection, and that the applicant is required to apply for such city permit immediately following the application for the building permit. All sewer connections must be constructed and inspected in accordance with the requirements of this article. The entity shall provide the entity with a copy of each building permit within five working days of the date of issuance of such building permit. The entity shall include, or cause the issuing body to include, on the face of each such building permit, notice to each recipient of a building permit that the permit is conditioned on compliance by the recipient with the terms of the code. (d) The city shall inspect construction of all building sewer connections and new main line sewers and sewer systems connected to the city's sewage system under such conditions as the director shall establish. The entity shall reimburse the city for the inspection of main line sewers. At the option of the city, the entity shall, in lieu of inspection by the city, obtain the services of an independent on-site inspector approved by the city to conduct such inspection. Reimbursement of such independent on site inspectors shall be entirely at the expense of the entity. Final approval shall, in any event, rest with the city. No connection of sewer systems shall be accepted or utilized without the prior approval of the city. (e) The director will cause periodic inspections of the entity's existing sewage system to be conducted to determine conditions, verify system locations, inspect connection points and otherwise as the city may require. Such inspections will be made either by the city or by an independent inspector approved by the city, and inspections shall be conducted at such intervals as deemed appropriate by the city based on the age and condition of the system. The cost of such inspection shall be paid by the entity and the users. (f) The entity will, at its sole cost and expense, complete an infiltration and inflow study. Such study will be conducted by an independent contractor approved by the city. The entity shall complete the rehabilitation, repairs and replacements which the director shall require according to the study and construction schedule set forth below: (1) By October 1, 2005 (or such other date as the director may determine), for parts of system that are five years old or older. By July 1, 2007 (or such other date as the director may determine), for newer parts of system. The entity is to complete a comprehensive infiltration and inflow study in all major drainage areas. This study to determine all sewer lines, manholes, etc. that need rehabilitation, repair or replacement to reduce infiltration and inflow into the sewer system. A copy of this study showing the rehabilitation, repair, and replacement work is to be supplied to the city. (2) By July 1, 2006 (or such other date as the director may determine), for parts of system that are five years old or older. By July 1, 2008 (or such other date as the director may determine), for newer parts of system. The entity is to have completed 25% of the rehabilitation, repair, and replacement work identified in the infiltration and inflow study. (3) By July 1, 2007 (or such other date as the director may determine), for parts of system that are five years old or older. By July 1, 2009 (or such other date as the director may determine), for newer parts of system. The entity is to have completed 50 percent of the rehabilitation, repair and replacement work identified in the infiltration and inflow study. (4) By July 1, 2008 (or such other date as the director may determine), for parts of system that are five years old or older. By July 1, 2010 (or such other date as the director may determine), for newer parts of system. The entity is to have completed 75% of the rehabilitation, repair, and replacement work identified in the infiltration and inflow study. (5) By July 1, 2009 (or such other date as the director may determine), for parts of system that are five years old or older. By July 1, 2011 (or such other date as the director may determine), for newer parts of system. The entity is to have completed 100 percent of the rehabilitation, repair, and replacement work identified in the infiltration and inflow study.

(G.O. 2072, 1-31-05; G.O. 2095, 5-9-05)

Ask a question about St. Joseph law

Corpus searches the St. Joseph sections it holds and shows the ones that match, with their citations. Free, no sign-in.