Sec. 31-366. - Solar readiness.

(a) No homeowners' agreement, covenant, common interest community, or other contract between multiple property owners within a subdivision shall restrict or limit solar energy systems to a greater extent than these regulations. (b) In the event that renewable energy systems are not being implemented in a project, the city will encourage that the building design is "solar ready" such that solar electric, solar thermal systems, or both can be easily installed at a later date. Therefore the developer and architect should anticipate the future introduction of solar technologies in the preliminary orientation and siting of the building. Development proposals should also incorporate MEC conduit/chases; structural loads and anchoring needed to provide solar electric and solar thermal renewable energy systems in the future. (c) The term "solar readiness" is not intended to apply to the orientation of streets or any other aspect of a construction project or subdivision other than the preparation of the structure(s) and the components thereof to facilitate the future conversion to solar energy use.

(G.O. 2698, 7-8-13)