For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11.66.010 — Permit—Required

Revised Code of the City of Saint Louis, 2020, Annotated (Supp. No. 11: codified through Ordinance No. 72042, enacted October 30, 2025) · St. Louis Revised Code § 11.66.010

Corpus is an independent public-information project, not the official City of St. Louis website. Stable reference: corpuslaw.us/code/285d68f1-3628-4a3c-b739-ef6ce363eea0

11.66.010 - Permit—Required.

The owner or occupant of any premises shall not permit sand, gravel, other similar aggregates having a particle size of less than one-half-inch diameter to be openly stored or piled at a height of twenty feet or more or loose materials if loaded out by the use of a conveyor to be openly stored or openly piled at a height greater than ten (10) feet, without first obtaining a permit from the Board of Public Service. The application for a permit shall contain a description and plat of the land proposed to be used for such open storage or piling and such other information the Board may reasonably require. Permits shall be issued by the Board of Public Service and shall contain such conditions and terms which the Board deems necessary to protect the public health and safety.

(1994 C., § 11.66.010; Ord. No. 59481, § 1, 1985.)

Ask a question about St. Louis law

Corpus searches the St. Louis sections it holds and shows the ones that match, with their citations. Free, no sign-in.