For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25.16.030 — Requirements for proposed construction

Revised Code of the City of Saint Louis, 2020, Annotated (Supp. No. 11: codified through Ordinance No. 72042, enacted October 30, 2025) · St. Louis Revised Code § 25.16.030

Corpus is an independent public-information project, not the official City of St. Louis website. Stable reference: corpuslaw.us/code/0eca95d1-9eab-4db4-81c6-18e4eb22f7fb

25.16.030 - Requirements for proposed construction.

The Building Commissioner, in reviewing all applications for construction in flood hazard locations within the City, shall require that any such proposed construction must: A. Be designed and anchored to prevent the flotation, collapse or lateral movement of the structure or portions of the structure due to flooding. B. Use construction materials and utility equipment that are resistant to flood damage. C. Use construction methods and practices that will minimize flood damage. D. Provide adequate drainage in order to reduce exposure to flood hazards. E. Locate public utilities and facilities on the site in such a manner as to be elevated or constructed to minimize or eliminate flood damage, such utilities and facilities including sewer, gas, electrical and water systems.

(1994 C., § 25.16.030; Ord. No. 56632, § 3, 1973.)

Ask a question about St. Louis law

Corpus searches the St. Louis sections it holds and shows the ones that match, with their citations. Free, no sign-in.