§ 8.29.150 — Technical requirements and channel capacity
Revised Code of the City of Saint Louis, 2020, Annotated (Supp. No. 11: codified through Ordinance No. 72042, enacted October 30, 2025) · St. Louis Revised Code § 8.29.150
Corpus is an independent public-information project, not the official City of St. Louis website. Stable reference: corpuslaw.us/code/de5f1cf5-2275-4b44-8427-fe19dfa658e5
8.29.150 - Technical requirements and channel capacity.
A. The cable system to be constructed by grantee shall be installed, maintained, and operated at all times in full compliance with all applicable technical and channel capacity standards of the Federal Communications Commission. B. The results of annual performance tests in accordance with FCC rules and regulations shall be retained by a grantee for at least five (5) years and shall be available for inspection by the franchise agency during business hours at grantee offices in the City upon twenty-four hours' notice. Copies of such test results shall be promptly provided upon the agency's request. C. A franchise agreement shall address technical performance and testing procedures. D. A grantee shall conduct monthly tests of the emergency alert system, in conjunction with the City department designated for such testing. E. The City shall have the authority to inspect any portion or component of the system, including, but not limited to, subscriber connections, in order to enforce compliance with the provisions, standards, and requirements of FCC regulations.
(1994 C., § 8.29.150; Ord. No. 65431, § 16, 2002.)
Ask a question about St. Louis law
Corpus searches the St. Louis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
