§ 10-36 — Continuous operation permit
Code of Ordinances, City of Batesville, Mississippi (Supp. No. 54: codified through Ordinance No. 2023-08-914, adopted August 15, 2023) · Batesville Code of Ordinances § 10-36
Corpus is an independent public-information project, not the official City of Batesville website. Stable reference: corpuslaw.us/code/041c2391-6698-41a6-afe8-cd3f45d7ca21
Sec. 10-36. - Continuous operation permit.
In the event of the operation on a regular basis of any vehicle or load over the streets and roads of the city, which vehicle and/or load or combination thereof exceeds the minimum size requirements required in this division, the owner or operator thereof may apply to the building official for a continuous operation permit. The continuous operation permit must be obtained annually and shall be valid for a period of twelve (12) months. The application in writing for the continuous operation permit must set forth each item specified in section 10-34, and must describe the general nature of the continuous operation of the vehicle and/or load. The continuous operation permit application must also describe the general times and routes of operation of the oversized loads over the streets or roads of the city. The application fee for the continuous operation permit shall be one hundred dollars ($100.00) per year, payable to the building official upon issuance of the continuous operation permit. The continuous operation permit shall not be available to movers of mobile homes. Because of the size variations applicable to mobile homes, single trip oversized load permits must be obtained for each transport of a mobile home exceeding the size limits of this division for each time a mobile home is moved over the streets or roads of the city at the cost provided in section 10-35.
(Ord. No. 83-260, § 4, 1-4-83)
Ask a question about Batesville law
Corpus searches the Batesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.