For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.41.13.A — Permits and Fee Requirements:

Byram Zoning Ordinance (2019); partial (Individual city-posted instruments; completeness and subsequent amendments unverified) · Byram Zoning Ordinance (2019), § 3.41.13.A

Corpus is an independent public-information project, not the official City of Byram website. Stable reference: corpuslaw.us/code/0ba860bd-f3fe-426c-ba1a-530f5a87cc41

3.41.13.A. Permits and Fee Requirements:

A. Permits and Fee Requirements:

1. All permanent signs permitted under this Ordinance, including existing signs, shall require a permit. Existing signs permitted under this ordinance, the permit fee will be waived.

2. No sign shall be erected, altered, or relocated without a permit, except as otherwise provided herein. Electrical permits as required shall be obtained at the same time as the sign permit.

Ask a question about Byram law

Corpus searches the Byram sections it holds and shows the ones that match, with their citations. Free, no sign-in.