302. Preliminary Plats and Construction Plans

302.01 Upon reaching conclusions regarding the general program and objectives, the developer may begin preparation of the required preliminary plat (s) together with construction plans for the required improvements specified in Article IV. The preliminary plat shall be at a scale of not less than one (1) inch equals one hundred (100) feet and shall show the following proposed improvements and conditions:

302.01-01 Title under which proposed subdivision is to be recorded, with names and addresses of owners, notation stating acreage, graphic scale, north arrow (true north), datum, benchmarks, and date of survey. 302 .01-02 Vicinity map at a scale of approximately one (1) inch equals one thousand (1,000) feet or as appropriate, showing the location of the site for the proposed subdivision.

302.01-03 Bearings and distances along boundary and mathematical closure of survey. 302.01-04 Location, width, and purpose of easements.

302.01-05 Names, right-of-way and roadway widths of streets, and approximate grades and gradients; similar data for alleys, if any. 302.01-06 Lot lines and lot numbers.

302.01-07 Sites, if any, to be reserved or dedicated for parks, playgrounds, or other uses public or private. Any subdivision which will have more than 50 lots shall be required to dedicate areas for green space as required by the City. 302.01-08 Utility line sizes, with approximate invert elevations (where appropriate). 302.01-09 Sites, if any, for apartment buildings, shopping centers, churches, industries or other non-public uses exclusive of single- family dwellings.

302.01-10 Building setback lines.

302.01-11 Contours based on mean sea level shall be shown with a two

(2) foot interval when slope is less than four (4) percent and with five (5) foot intervals for slopes over four (4) percent; and spot elevations along canals or ditches and at any breaks in grade or changes in elevation not readily discernible from the contours shall be shown.

302.01-12 Watercourses, marshes, flood areas, wooded areas, houses, and other significant features. 302.01-13 Any proposed protective covenants and homeowners associations.

302.01-14 All pages must be signed and sealed by a design professional registered to practice in the State of Mississippi. 302.02 Construction plans for required improvements as specified in Article IV shall be submitted for review and approval by the Public Works Director. 302.02-01 The improvements specified herein shall be designed by and constructed under the inspection of a registered professional engineer, registered to practice in Mississippi.

302.02-02 In order to obtain approval for the construction of improvements in a subdivision, the developer shall submit construction plans showing the types of improvements contemplated. Construction plans shall be accompanied by a geotechnical investigation for all proposed developments and subdivisions. Said plans shall be submitted

and approved by the Public Works Director before construction is begun in the development/subdivision. The construction plans shall be prepared on sheets twenty-four (24) by thirty-six (36) inches and shall consist of a combination plan and profile for each street and a typical cross-section of the proposed grading, drainage, base course, and pavement. Detailed plans shall be submitted for the water and sanitary sewer systems and for culverts, drainage structures, and bridges. The plan and profile sheets (streets and sanitary sewers) shall be drawn to a horizontal scale designated by the Public Works Director and referenced to State Plane Coordinates.

302.3 Four (4) copies of the preliminary plat as well as a digital copy of the plat in a format as specified by the Department of Community Development, for required improvements specified in Article IV, shall be submitted initially to the Planning and Zoning Board with a letter requesting approval. This data shall be submitted at least fifteen (15) days prior to the Planning and Zoning Board meeting at which it is to be considered. Failure of the Planning and Zoning Board to review an application within sixty (60) days after submission to the City Clerk shall permit the applicant to submit the application directly to the Board. Three copies of the construction plans shall be submitted to the Public Works Department for review and approval.

302.4 Following a review of the preliminary plat, construction plans and other material submitted for conformity to these regulations, and following negotiations with the developer on changes deemed advisable and the type of improvements to be made in the proposed development, the Community Development and Public Works Departments, respectively, shall express informally their approval or disapproval and state of conditions. The Community Development Department shall maintain a project file of departmental comments.

302.5 The Planning and Zoning Boards decision concerning the Preliminary Plat can be appealed to the Board within 3 working days of the Planning & Zoning Board action. The preliminary plat approval may be extended for one additional year if a written request is submitted by the developer for action of the Planning & Zoning Board. A total of two one-year extensions can be granted by the Planning & Zoning Board subject to any ordinance revisions.

302.6 Approval of the preliminary plat shall not constitute approval of the final plat, nor shall the preliminary plat be recorded in the Chancery Clerk’s office. Approval of the preliminary plat by the Board shall not constitute authorization for the developer to proceed with construction of the subdivision until written certification from the Mississippi State Department of Health, the Mississippi Department of Environmental Quality, City of Jackson and any other utility company that the proposed systems are in conformance with all applicable laws and regulations is furnished to the Board. Construction of all required improvements is subject to inspection and approval by the Public Works Director and other appropriate officials or agencies which have a lawful

interest in the development. All construction shall be done in conformance with the approved preliminary plat and construction plans. The Community Development Department with the concurrence of the Public Works Department shall issue a permit to start work once all of the required approvals have been granted and all required fees have been paid. A permit card shall be posted on the subject property that is visible to the street. Failure to obtain and post the permit is a violation of this ordinance.