§ 412 — Erosion and Sediment Control

Byram Zoning Ordinance (2019); partial (Individual city-posted instruments; completeness and subsequent amendments unverified) · Byram Development Regulations (city-labelled 2011), § 412

Corpus is an independent public-information project, not the official City of Byram website. Stable reference: corpuslaw.us/code/c9e43422-4459-4613-ab00-2e9bf1e7de34

412. Erosion and Sediment Control

412.01 Installation of the above improvements shall be done in such a manner as to provide for the most effective control of erosion and sediment. All erosion control measures shall be in accordance with the State and Federal requirements. Practical combinations of the following technical principles shall be used:

412.01-01 The smallest practical area of land shall be exposed at any one time during development.

412.01-02 When land is exposed during development, the exposure shall be kept to the shortest practical period of time. 412.01-03 Temporary vegetation and/or mulching shall be used to protect critical areas exposed during development. 412.01-04 Sediment basins (debris basins, desilting basins, or silt traps) shall be installed and maintained to remove sediment from runoff waters from land undergoing development.

412.01-05 Provisions shall be made to effectively accommodate the runoff caused by changed soil conditions during and after development. 412.01-06 Permanent final vegetation and structures shall be installed as soon as practical in the development.

412.01-07 The development plan shall be fitted to the topography and soils so as to create the least possible erosion. 412.01-08 Whenever feasible, natural vegetation shall be retained and protected.

413. Storm Water Detention Facilities

413.01 This design standard shall apply to any residential development of five acres or more or any nonresidential development of one acre or more. This ordinance shall also apply to any residential development of less than five acres or any nonresidential development of less than one acre but having 50% or greater impervious surface.

Rate of run-off shall be determined at each point where run-off leaves the property being developed in its pre-development state. The storm water management system shall be designed so that the peak flow rate at any exit point in the post-developed conditions shall be less than or equal to the peak flow rate for that exit point in the pre-developed condition for the 2-year, 10-year, 25-year, and 100-year 24 hour storms.

The increased storm water runoff resulting from the proposed development shall be detained by retention or detention facilities, or by other means subject to the approval of the City Engineer.

Retention or detention facilities shall be designed with sufficient capacity to accommodate all runoff caused by the development in excess of that runoff which would occur from the site if left in its natural, undeveloped condition. This storage shall be sufficient to control the excess runoff for the 2-year, 10-year, 25-year, and 100-year storms (24-hour duration).

It is the responsibility of the developer to ensure that the storm water runoff from the proposed development shall not increase channel instability downstream, or change the timing of the 100-year peak flow so as to increase flood damages to existing developments or property. In determining downstream effects from storm water management structures and the development, hydrologic-hydraulic engineering studies shall extend downstream to a point where the proposed development represents less than ten percent of the total watershed draining to that point.

If detention storage is provided within the 100-year floodplain, NO storage volume for the facility may be considered below the base flood elevation established for that floodplain. Retention/detention facilities shall NOT be located in a regulatory floodway.

Drainage systems shall have the capacity to pass the 100 year-24 hour storm flow from all upstream areas through the development and will require the ditch plus ten (10) feet to be included in an easement that cannot be included in the minimum lot size.

413.02 The following information and data shall be furnished with the plans of each proposed residential, commercial and industrial development. This information and data must be prepared and certified by a licensed professional engineer registered in the State of Mississippi:

A topographic map with (as a minimum) two-foot interval contours of the land to be subdivided and such adjoining land whose topography may affect the layout or drainage of the subdivision. On such a map, the following shall be shown:

413.02.01 The banks and centerline of streams and channels. 413.02.02 The normal shoreline of lakes, ponds, and retention/detention basins, and lines of inflow and outflow;

413.02.03 The location, size and slope of storm water conduits and drainage swales. 413.02.04 Storm, sanitary and combined sewers and outfalls of record. 413.02.05 Delineation of upstream and downstream drainage features and

watersheds which might be affected by the development.

413.02.06 Base flood (l00-year) elevations and regulatory floodways which have been identified for the property. 413.02.07 Environmental features including the limits of wetlands areas and any designated natural areas.

A comprehensive drainage plan designed to safely and completely handle the storm water runoff and to detain increased storm water runoff. This plan shall provide and be accompanied by maps and/or other descriptive material showing the following:

i. The extent and area of each watershed tributary to the drainage channels in the development.

ii. The storm sewers and other storm drains to be built, the basis of their design, the outfall and outlet locations and elevations; receiving stream or channel and its high water elevation and the functioning of the drains during high water conditions. iii. Existing streams and floodplains to be maintained and new channels to be constructed including their locations, cross-sections and profiles. iv. Proposed culverts and bridges to be built including their materials, elevations, waterway openings and basis of design. v. Existing retention/detention facilities to be maintained, enlarged or altered and new facilities to be built including their design. vi. The estimated location and percentage of impervious surfaces existing and expected to be constructed when the development is completed. vii. The slope, type, and size of all sewers and other waterways

viii. Any proposed environmental enhancement or mitigation features.

ix. Retention/detention basins to be built including a plot or tabulation of storage volumes with corresponding water surface elevations and of the basin outflow rates for those water surface elevations. x. For all retention/detention basins, design hydrographs of inflow and outflow for the l00-year peak flows from the site under natural and developed conditions. xi. Landscaping plan for retention/detention facility.

xii. One or more typical cross-sections of all existing and proposed channels or other open drainage facilities, showing the elevation of the existing land and the proposed changes thereto, together with the high water elevations expected from storm water runoffs under the controlled conditions called for by this design standard, and the relationship of structures, street and other utilities.

413.03 Detention Basins: A detention basin is considered to be a surface water run-off storage facility which is designed to hold runoff temporarily during and immediately after a runoff event. This includes but is not limited to: swales with crosswise earthen berms, constructed or natural surface depressions, subsurface tanks, pipes or reservoirs. Detention basins will conform to the following standards:

413.03.01 The volume of storage provided in these basins, together with such storage as may be authorized in other detention facilities shall be sufficient to control the excess runoff from the 2-year, 10-year, 25 year, and 100-year storm of 24-hour duration.

413.03.02 The maximum planned depth of storm water stored shall not exceed five feet unless natural ground conditions lend themselves to greater depths. 413.03.03 The side slopes of the basin shall conform as closely as possible to natural land contours. Re-grading is preferable if necessary to keep the slopes under ten percent. Erosion control measures shall be provided as well as devices or measures to insure public safety.

413.03.04 Outlet control structures shall be designed as simply as possible and shall operate automatically. They will be designed to limit discharges into existing or planned downstream channels or conduits so as not to exceed predetermined safe capacities and not in excess of flows which would have occurred with the land in its natural, undeveloped condition. If necessary, velocity dissipation measures shall be employed to ensure that the discharge does not increase downstream erosion.

413.03.05 Emergency spillways should be constructed in cut sections whenever possible. In the event that a ramp spillway is required by site conditions, this spillway must be paved using either concrete or riprap from the beginning of the control section to at least five feet past the downstream toe of the dam. The emergency spillway must be designed to pass the 100 -year/24 hour storm. 413.03.06 Detention facilities shall, where possible, use natural topography and natural vegetation. In lieu of this, these facilities shall have planted trees and vegetation such as shrubs and permanent ground cover on their borders. In no case should trees or deep-rooted vegetation be planted in the levee itself. This requirement does not supersede the Landscape Ordinance of the City of Byram.

413.03.07 The Mayor and Board of Aldermen of the City of Byram may elect to require the facility to be enclosed by fencing. The Mayor and Board of Aldermen will approve the type, size and appearance of fencing.

413.04 Retention Basins: Basins designed with permanent pools shall conform to the standards for detention basins as specified in paragraph c. unless modified or amended as follows:

413.04.01 The minimum normal depth of the permanent pool shall be four feet. 413.04.02 For emergency purposes, cleaning or shoreline maintenance, facilities shall be provided or plans prepared for the use of auxiliary equipment to permit emptying and drainage.

413.04.03 Aeration facilities may be required, dependent on the quality of the influent and detention time.

413.04.04 The side slopes shall be of non-erosive material with a slope of 3:1 or flatter. The ledge shall be four to six feet wide three feet below normal water depth and sloped gently toward the shore to prevent people or objects from sliding into deep water. Alternate designs for side slopes may be considered under special circumstances where good engineering practice is demonstrated. 413.04.05 All retention basins shall have a minimum freeboard of 18 inches above the high water elevation of the routed 100-year/24 hour storm event. 413.04.06 Adequate area for sediment storage shall be provided in all retention basins. Sediment removal should be required no more than annually.

413.05 The developer shall be responsible for the maintenance of all improvements until such time as 80 percent of the lots have been improved with buildings and Occupancy permits issued or until such time as 80 percent of the lots in the development have been sold. However, the developer shall not transfer these improvements for the purpose of maintenance until he has complied with the above and until he has received final approval, final inspection, and a Certificate of Compliance from the City Engineer.

All improvements, including landscaping, shall be maintained in perpetuity and cannot be developed for any other use which would limit or cause to limit the use of the improvements. The improvements shall be owned and/or maintained by the Property Owner's Association of the development. Each property owner shall own a proportionate share of the improvements and shall bear his proportionate responsibility for the continued maintenance in accordance with the above.

Each property owner shall, within the contents of his deed, be liable for the combined maintenance of the improvements. A special note to this effect shall appear on any final plat of subdivision or any plat of condominium and their declarations.

The Property Owners' Association shall be formed in perpetuity for the maintenance of the improvements. Membership shall be mandatory by all property owners. Articles of agreement of the Property Owner's Association must be approved by the Board of Alderman of the City of Byram before recording.

In subdivisions consisting of five single- family residential lots or fewer, the provision of a Property Owners’' Association may be waived, provided that other parts of this Section have been met.

When problems arise due to inadequate maintenance, the City Engineer of the City of Byram may inspect the improvements and compel the correction of the problem by written notice. In the case of failure of a facility, the Property Owners' Association may contract with the City of Byram for the correction of the problem, provided the City is adequately reimbursed.

413.06 Whenever drainage facilities are planned to service several projects or a specific area deemed necessary by the City of Byram, the City may elect to accept the drainage facilities by dedication to the City. When these projects are of a regional nature, the City of Byram will maintain these facilities. In these cases, access easements shall be provided to the city.

413.07 The City Engineer shall inspect all drainage facilities while under construction. When facilities are not constructed according to approved plans, the City of Byram has the explicit authority to compel compliance and have any situations corrected which are not according to the approved plans. All drainage facilities located on private property, whether dedicated to the City or not, shall be accessible at all times for inspection by the City Engineer or other responsible public official.

413.08 The requirement for onsite retention/detention facilities may be waived by the City of Byram if it is determined that a development project is too small, or if engineering, aesthetic or economic factors make a combined or regional facility more practical for construction by the city. In this case, the City of Byram shall require a fee and/or dedication of land from the developer, which the city shall use to construct the regiona1 facility. This fee and/or dedication of land shall be based on the proportionate share for the development in its completely developed state of the present costs of constructing the regional facility.