§ 503 — Water Distribution System
Byram Zoning Ordinance (2019); partial (Individual city-posted instruments; completeness and subsequent amendments unverified) · Byram Development Regulations (city-labelled 2011), § 503
Corpus is an independent public-information project, not the official City of Byram website. Stable reference: corpuslaw.us/code/5edaea5c-fdd1-48e5-a5ab-d08d3d481c48
503. Water Distribution System
A means of delivering potable water from an approved water supply to each lot in a developed subdivision or to each residential unit in planned unit development at times of peak demand shall begin at the nearest existing water main and terminate with a suitable valve at the front lot (street) line of each lot or at the building wall or other proper location in planned unit development.
Water mains shall be correlated with and connected into the water distribution system in a manner commensurate with future needs and must comply with the requirements imposed by the Mississippi State Department of Health, the City of Jackson and the City of Byram. Consumers shall not be connected to the system through recently constructed facilities until a clear or negative sample report has been obtained from the Mississippi State Department of Health and written approval from the City of Jackson.
Ask a question about Byram law
Corpus searches the Byram sections it holds and shows the ones that match, with their citations. Free, no sign-in.
