Section B. - Permit procedures.

Application for a Development Permit shall be made to the Floodplain Administrator on forms furnished by him or her prior to any development activities, and may include, but not be limited to, the following plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question; existing or proposed structures, earthen fill, storage of materials or equipment, drainage facilities, and the location of the foregoing. Specifically, the following information is required: (1) Application Stage. a.) Elevation in relation to mean sea level of the proposed lowest floor (including basement) of all buildings, which will be submitted on a FEMA Elevation Certificate Form 81-31 by a State of Mississippi registered engineer or surveyor; b.) Elevation in relation to mean sea level to which any non-residential building in an A Zone will be floodproofed; c.) Certificate from a State of Mississippi registered professional engineer or architect that the non-residential flood-proofed building will meet the floodproofing criteria in Article 4, Section B(2), Article 5, Section B(2) and Section D(2); d.) Description of the extent to which any watercourse will be altered or relocated as result of proposed development. (2) Finished Construction. Upon completion of construction, a FEMA Elevation Certificate Form 81-31 which depicts all finished construction elevations is required to be submitted to the Floodplain Administrator. If the project includes a floodproofing measure, a FEMA floodproofing certificate is required to be submitted by the permit holder to the Floodplain Administrator.

(Ord. of 2-7-23(1))