§ 5 — Storm drainage plan
Code of Ordinances, City of Columbus, Mississippi (Supp. No. 15: codified through Amendment of October 21, 2025) · Columbus Code of Ordinances, App. A, art. V, § 5
Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/d7de9bfc-adf6-48ce-b84d-caf54178952d
Sec. 5. - Storm drainage plan.
5.1. Purpose of storm drainage plan. A storm drainage plan shall be required, as stated by the provisions of this ordinance, to ensure the development of adequate storm drainage facilities. 5.2. [Required.] A storm drainage plan shall be required for the following: (1) Any residential development of ten (10) or more dwelling units, except single-family lots which have already been approved by the planning commission; (2) Any residential, commercial or industrial development having structures in excess of three (3) stories; (3) Any commercial or industrial development adjacent to property zoned R-1, R-2, R-3 or R-4; (4) Any residential, commercial or industrial development encompassing three (3) acres or more, except single-family lots which have already been approved by the planning commission; (5) Any hazardous development and/or use within the I-3 Heavy Industrial District; (6) Planned Unit Development District; (7) Any residential, commercial or industrial development located within the F-1 Floodplain District; (8) Other special cases and projects that may be brought to the city engineer's attention by the city council, the director of planning and community development, the building permit department or the zoning administrator. Particularly, special cases in the C-1 Commercial District which are in close proximity to low density residential shall be reviewed. 5.3. Contents. (1) Drainage calculations analyzing runoff before and after development and for the design of on-site drainage improvements must accompany maps showing location of project, including such natural features as streams, lakes, existing drainage ditches and other topographical features. Drainage calculations must be prepared by a registered professional engineer. Calculations must be based on a storm event having a ten-year frequency. (2) A brief analysis of problems posed by increased storm water runoff on downstream properties must be submitted. If off-site drainage facilities downstream of the development are not adequate to accommodate post-development runoff, retention or detention facilities must be considered. 5.4. Conditions and general considerations on issuance of storm drainage plan approval. The storm drainage plan shall be approved only after a consideration of the manner of drainage on the property, with particular reference to the effect of provisions for drainage on adjacent properties and the consequence of such drainage on overall city capacities. 5.5. Procedure. A storm drainage plan, as provided in sections 5.3 and 5.4 above, shall be filed with the building official, whose duty it will be to submit the plan to the city engineer. If rezoning, in whole or in part, is required, the city engineer shall review the storm drainage plan prior to further processing the application. Applicant shall have the right to appear before the city engineer for the review of the plan. (1) Compliance: The city engineer shall certify to the building official that said plan does or does not comply with this section. If the plan does comply, the building official shall complete processing of the permit application. If the plan does not comply, the city engineer shall so specify in what respects it does not comply, in writing to the applicant and to the building official, who shall then require correction and compliance before further processing. The applicant will be required to submit an engineer's certification that the work was completed according to the storm drainage plan before receiving a certificate of occupancy for the project. (2) Time period for review: In all cases, the city engineer shall have up to or a maximum of thirty (30) days from the date of filing to review and recommend either approval or disapproval of any plan. (3) Should the storm drainage plan be approved, this approval shall be valid for three (3) years from the time of approval, providing there have been no changes in the city's requirements during that three (3) years. If changes have been made to the city's requirements during the three (3) year period, then a new application shall be necessary. And if a zoning change was required, zoning shall be advertised for public hearing for consideration by the planning commission to be changed to its former zoning classification.
Ask a question about Columbus law
Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.
