For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 305 — PERMANENT EASEMENTS

Comprehensive Development Regulations for the City of Flowood; partial · Flowood Development Regulations § 305

Corpus is an independent public-information project, not the official City of Flowood website. Stable reference: corpuslaw.us/code/5f8e9ac9-e71e-4079-9312-aae9145c2cf2

SECTION 305 PERMANENT EASEMENTS

305.1 Easements across lots or centered on rear or side-lot lines shall be provided for public utilities. Such easements shall be to the width necessary for the City to have access and the room needed to provide maintenance. This shall be determined based on the type of and depth of the utility and shall be at least a minimum of ten foot (10’) in width.

305.2 Utility easements at least ten feet (10’) in width shall be provided outside, adjacent to and parallel to the street right-of-way for the purpose of accommodating water, sewer, storm drain, electrical lines, cable lines, communication lines, telephone lines, gas lines and other public utilities or infrastructure in residential, commercial, and industrial areas.

305.3 Where easements intersect or sharp changes in alignment are necessary, corners shall be sufficiently cutoff to permit equipment access subject to the approval of the City Engineer.

305.4 No buildings, fences or structures shall be permitted within easements unless specifically approved by the City Engineer. If so constructed (with or without City approval), any removal necessary for the City to replace, repair or otherwise use its easement shall be at the expense of the owner of the property at the time of the repair, replacement or other use.

305.5 Any overhanging limbs, shrubbery or other vegetation which form an obstruction may be moved from within the limits of a utility easement at the discretion of the maintenance personnel of the utilities installed or to be installed in or above the easements.

305.6 Every easement shall terminate at both ends upon a street, alley, or another easement except where necessary dead-end easements will be permitted upon review by the City Engineer. The City and/or utility company shall be held harmless of any claims against them for replacement of obstructions removed during maintenance or construction activities on such utility. The City of Flowood shall have the right to utilize any platted or dedicated easement for public use regardless of the designation of the easement.

305.7 Where a subdivision or property is traversed by a water course, drainage way, channel or stream, there shall be provided a storm water easement or drainage right-of-way conforming substantially with the lines of such water course or an accepted canal or drainage course, and such further width or construction, or both, as will be necessary for equipment access.

Ask a question about Flowood law

Corpus searches the Flowood sections it holds and shows the ones that match, with their citations. Free, no sign-in.