For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10.12 — Water Supply System

Gautier Unified Development Ordinance (cover updated June 19, 2025); partial · Gautier Unified Development Ordinance § 10.12

Corpus is an independent public-information project, not the official City of Gautier website. Stable reference: corpuslaw.us/code/9d87bc9c-bf38-46c1-bc60-e54355f0fac2

SECTION 10.12: Water Supply System

The subdivider shall provide suitable water mains and provide a water connection in accordance with the City minimum design standards for required improvements for each lot to a water supply approved by the Mississippi State Board of Health and City of Gautier Utility Division. The water mains shall be of sufficient size to adequately supply the requirements of the subdivision for domestic use and fire protection in accordance with the standards of the Mississippi State Rating Bureau and the Mississippi State Board of Health, and shall conform to the following requirements: 10.12.1 General Requirements A. The applicant shall extend the existing water-supply district for the purpose of providing a water-supply system capable of providing domestic water use and fire protection. B. The subdivider shall install adequate water facilities (including fire hydrants) subject to the specifications of the City of Gautier Utility Division and system shall be designed in accordance with the City minimum design standards for required improvements. C. Water main extensions shall be approved by the City of Gautier Utility Division and the Mississippi State Board of Health. D. To facilitate the above, the location of all fire hydrants, all water supply improvements, and the boundary lines of proposed districts, indicating all improvements proposed to be served, shall be shown on the preliminary plat, and the cost of installing same shall be included in the performance bond to be furnished by the developer. E. Materials shall conform to the City minimum design standards for required improvements. 10.12.2 Individual Wells and Central water systems Within the discretion of the Public Works Director and/or Planning Director, if a public water system is not available, individual wells may be used or a central water supply system shall be provided in such a manner that an adequate supply of potable water will be available to every lot in the subdivision. Water samples shall be submitted to the Mississippi State Board of Health for its approval. All design requirements and acceptance of individual wells and central water systems shall be approved by the Mississippi State Board of Health. Orders of approval shall be submitted to the Public Works Director and/or Planning Director. A. Based on a schedule from the City of Gautier Utility Division, if the Public Works Director and/or Planning Director determines that public water may be provided within five (5) years, as a condition to approval of an individual well or central water system, the applicant shall provide the design and approvals for future water service at the time the plat received final approval. Performance or cash bonds shall be required to insure compliance. B. There shall be no physical connection between public and private potable water supply systems. 10.12.3 Future Water System: To eliminate street openings for future water systems, the Public Works Director and/or Planning Director shall require any of the following: A. The entire water system to be constructed and capped for future connections; or B. Pipe casings to be installed at all street crossings; or C. Boring methods. In all cases the design engineer shall be required to design and furnish design drawings of the complete water system to be installed. 10.12.4 Fire Hydrants Fire hydrants shall be installed in accordance with local fire prevention codes. Fire hydrants shall be required for all subdivisions. Fire hydrants shall be located no more than one thousand (1000) feet apart and within five hundred (500) feet of any residential structure and within four hundred (400) feet of any commercial structure. Fire Hydrants shall be designed and installed per requirements of the Mississippi State Rating Bureau. To eliminate future street openings, all underground utilities for fire hydrants, together with the fire hydrants themselves and all other supply improvements shall be installed before any final paving of all streets shown on the subdivision plat. Hydrants shall be served by a minimum size water main of eight (8) inches or six (6) inches if lines are looped or as supported by engineering calculations.

Ask a question about Gautier law

Corpus searches the Gautier sections it holds and shows the ones that match, with their citations. Free, no sign-in.