§ 15.5 — Necessary repairs
Gautier Unified Development Ordinance (cover updated June 19, 2025); partial · Gautier Unified Development Ordinance § 15.5
Corpus is an independent public-information project, not the official City of Gautier website. Stable reference: corpuslaw.us/code/ef4f8c9b-f0ec-46b8-bfee-1868656fdf1a
SECTION 15.5: Necessary repairs
It shall be the responsibility of the building permit holder to make within the prescribed one hundred twenty (120) day period, all repairs defined on the evaluation report. Said repairs may include, but are not limited to the following: A. All electrical wiring, service panels, load centers, necessary ground fault breakers, receptacles and other electrical appurtenances shall be installed in accordance with standards set forth in the National Electrical Code. B. All plumbing shall be in accordance with the Southern Standard Plumbing Code and structures are required to be properly connected to City water and sewage. C. Gas piping will be pressure tested following relocation and must meet standard gas codes. D. Heating and ventilation shall meet standard mechanical codes. E. From a structural perspective all relocated buildings must meet new construction standards. Building permit holders shall be required to comply with the Building Official's evaluation report which may require, where necessary, the following: 1. All deteriorated exterior surfaces shall be replaced with matching materials or approved substitutes. This may include, but is not limited to, facias, soffits, external wall, window and door frames and facings and porches. 2. Where roofs are required to be repaired the entire roof, including sheathing if necessary, will be replaced when more than twenty-five percent (25%) of the existing roof is damaged or deteriorated. 3. Structural framing, including but not limited to rafters, ceiling joists, headers, studs, floor joists and sills will be examined for proper sizing, spacing and for termites or rot damage. Relocated structures must meet hurricane clip and strip requirements. Findings will be noted in the evaluation report and all such deficiencies will be repaired prior to issuance of a Certificate of Occupancy. 4. Minimum housing codes as defined in the International Building Code which has been adopted by the City shall be met with particular reference to required facilities such as sanitary facilities, availability of hot and cold water, cooking devices, fire and smoke detectors and adequate heat, light and ventilation. 5. Additionally, relocated buildings must meet City codes relative to proper zoning; setbacks; minimum lot size; in the case of residential structures, minimum living area (heating and/or cooled); and, parking pads suitable for two (2) parking spaces per household or as defined by the Planning Department for nonresidential structures. F. Inspection of repairs. It shall be the responsibility of the building permit holder to call for inspections of all repair work, within the prescribed one hundred twenty (120) day period. G. Extension of the repair period may be granted by the Planning Department provided that repair efforts have been curtailed due to inclement weather, natural disasters, or other physical constraints beyond the control of the building permit holder. Said extension must be requested in writing and presented to Planning Department on or before the end of the one hundred twenty (120) day period. Extensions for any cleared and cleaned property, other reasons or a second extension may only be approved by the Planning Commission.
Ask a question about Gautier law
Corpus searches the Gautier sections it holds and shows the ones that match, with their citations. Free, no sign-in.
