§ 10-123 — Evaluation process
Code of Ordinances, City of Gulfport, Mississippi (Supp. No. 68: codified through Ordinance No. 3551, enacted January 20, 2026) · Gulfport Code of Ordinances § 10-123
Corpus is an independent public-information project, not the official City of Gulfport website. Stable reference: corpuslaw.us/code/1cc46c5c-a0d2-4cea-8faf-f64eb5fbb693
Sec. 10-123. - Evaluation process.
(a) [Two-phase minimum.] The evaluation process for determining the need for in-building amplification is conducted in a minimum of two phases: pre-construction and acceptance/implementation. (b) Pre-construction phase. (1) Before the construction of the new building, basic information can be gathered to begin the process of determining the need, type and actual implementation of augmentation to the radio system. In most cases, the following information must be known to properly design and cost estimate an in-building radio system. a. New building information. 1. Type/size of building—Single story, multilevel, square footage, number of stories. 2. Orientation of building—Above/below ground, line of sight. 3. Construction of the outer and inner walls—Plaster, drywall, brick, sheet metal. 4. Proposed equipment locations—Equipment rooms, cableways, conduits. 5. Building location—Longitude and latitude coordinates. 6. Local building code requirements and special requirements. 7. Building blueprints and drawings. b. Existing system information. To be supplied by Harrison County Emergency Communications Commission. 1. Public safety radio network site location nearest to construction locations. 2. Donor channel frequency—Specific digital channel to enhance radio coverage. 3. Grade of service required to meet coverage requirements. 4. Type of subscriber unit. 5. Number of channels and their frequencies. 6. Signal strength of donor site at the building locations. With the information above, the following steps can establish the potential need for a building amplifier. c. Needs determination—Signal strength measurements. 1. At the planned construction site, measure (or have measured) the signal strength of the donor control channel. 2. If the signal strength of the donor is -95 dBm or less on the outside of the building, the probability of additional in-building coverage is high. 3. If the signal strength of the donor is greater than 95 dBm, determine the expected signal strength of the donor by subtracting the sum of the interior losses due to walls, doors, and windows from the ambient signal outside the building. (See table 1.) 4. If a signal strength of -95 dBm or greater is calculated at the innermost point of the building, an in-building system may not be required. 5. If a signal strength is calculated at -95 dBm or less, an in-building system is warranted. 6. To determine signal strengths for specific areas and evaluate the impact of the proposed building on existing structures, consult the latest Harrison County Emergency Communications District RF Survey Report. 7. If determined that an in-building amplification system is required for either the proposed site or existing structures impacted by the proposed construction, provide placeholder in budget for cost of communication system based on results of the above. (c) Acceptance test procedures. (1) Acceptance testing for an in-building radio amplification system is required, upon completion of installation of the system is required, upon completion of installation of the system. It is the owner's responsibility to have the radio amplifier system functionally tested to ensure adequate two-way coverage provided on each floor of the building is in compliance with requirements as set forth in this division. (2) A minimally acceptable test plan shall require that each floor of the building be divided into a grid of approximately twenty (20) equal areas. A maximum of two (2) nonadjacent areas will be allowed to fail the test. (3) In the event that three (3) of the areas fail the test, in order to be more statistically accurate, the floor may be divided into forty (40) equal areas. In such event, a maximum of four nonadjacent areas will be allowed to fail the test. After the forty (40) area tests, and if the system continues to fail, the owner shall repair, replace, alter, or upgrade the system to meet the coverage requirements of this division. (4) Talk-out and talk-back testing from the building site to the Harrison County Public Safety Radio Network shall use a three-watt portable transceiver without speaker/microphone and flexible antenna. (5) A test location approximately in the center of a grid area will be selected for the test, then the radio will be keyed with a voice message used to verify two-way communication to and from the outside of the building. (6) Once the test location has been selected, use of another test location within the grid area will not be permitted. Each test location will also require the capture of the actual signal strength (measured in units of dBm) at that location. (7) Signal strength testing instruments are to be recently calibrated (within the past twelve (12) months prior to testing) and of a frequency selective type incorporating an antenna similar to the ones used on the hand-held transceivers. (8) The gain values of all building amplifiers shall be measured and the results kept on file with the owner so that building amplifier performance measurements can be verified each year during the annual tests. (9) In the event that the measurement results become lost, the owner will be required to rerun the coverage acceptance test to reestablish the gain values.
(Ord. No. 2536, § 9.0, 5-9-07)
Ask a question about Gulfport law
Corpus searches the Gulfport sections it holds and shows the ones that match, with their citations. Free, no sign-in.
