§ 12-94 — Administrative/processing requirements
Code of Ordinances, City of Gulfport, Mississippi (Supp. No. 68: codified through Ordinance No. 3551, enacted January 20, 2026) · Gulfport Code of Ordinances § 12-94
Corpus is an independent public-information project, not the official City of Gulfport website. Stable reference: corpuslaw.us/code/aea9e529-58fd-4cbd-b27e-00c70225295c
Sec. 12-94. - Administrative/processing requirements.
(a) Substantial conformance review. Substantial conformance review ("SCR") is a process where projects can undertake modifications that are deemed to be in "substantial conformance" with the original permit. The goal of an SCR is to determine if the proposed project is consistent and in conformance with a previously-approved permit. This includes a review of the revised project against the approved exhibits, permit conditions, environmental documentation, applicable land use policies and the public record for the prior permit. An SCR for a WCF must minimally meet the following criteria: (1) An SCR cannot be used to change the number of any visible WCF components or concealment elements. (2) An SCR cannot be used to increase the size, reduce the symmetry, or alter the appearance of any visible WCF components or concealment elements unless the change would positively affect the appearance of the facility. (3) An SCR cannot be used to increase the height of a project. (4) An SCR cannot be used to increase the amount of visible cabling. (5) An SCR cannot be used to cause visible elements to be different colors. (6) An SCR will not be granted if the site is not in compliance with its existing permit. (7) A building permit implementing the changes approved by an SCR must be issued within one (1) year and pursued to completion or the SCR is null and void. (b) Spectrum Act. Pursuant to section 6409(a) of the federal "Middle Class Tax Relief and Job Creation Act of 2012" (the "Spectrum Act"), the city "may not deny, and shall approve, any eligible facilities request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or base station." The city complies with FCC report and order FCC-14-153, and the reader is referred to that document for more information (see pages 10 and 11 of that document for a summary). However, the following is of note, and is supported by the report and order: (1) To be considered "existing" under the Spectrum Act, a site must be constructed in accordance with all applicable permits, including all permit conditions (page 86, paragraph 174). If not, the site cannot be considered an eligible facilities request. Applicants should research the complete permit history of their site before making a Spectrum Act application. Should a project not qualify, fees will not be refunded. (2) Because a site must be "existing" to be considered an eligible facilities request, the city does not allow Spectrum Act applications to be used to bring a site into compliance with its permit. The site must be compliant at the time of application. The city makes an exception to this requirement if the non-compliance is related solely to previously-required landscaping that can be installed in conjunction with the Spectrum Act application. (3) Spectrum Act applications may not defeat existing concealment elements, and must comply with all permit conditions, except where the Spectrum Act separately allows certain modifications (page 100, paragraph 200). (4) Spectrum Act applications may not include replacement of the underlying structure (page 89, paragraphs 180 and 181). (c) WCFs are iterative, which means plans require additional information. WCFs typically have a series of permits that make incremental enhancements to a site, and can also change property owners/managers/carriers. This can make it difficult to account for exactly what is permitted on a site. The following are standards to facilitate plan review. (1) Show the entire WCF on the plans, regardless of what is being modified. Every component should be shown. Show existing and proposed site plans, and elevations from all four (4) directions, whether or not the elevation has any changes. (2) Project documents should reflect the total number of antennas, RRUs, RRHs, surge suppressors, generators, equipment cabinets, equipment rooms, cables, cable trays, and similar at a site, regardless of what is being modified by the current project. Even if only one (1) antenna is being replaced, the whole WCF should be shown and described. (3) Project descriptions on applications and plans should describe the WCF in total. In other words, if an existing site has twelve (12) antennas, the project description should not say "remove and replace three antennas", it should say "remove and replace three antennas, nine existing antennas and twelve existing RRUs to remain, total of twelve antennas and twelve RRUs" or similar. (4) Specifications for all antennas, RRUs, RRHs, generators, and similar on a site should be provided, regardless of what is being modified by the current project. Even if the project is only to add one (1) antenna, specifications for everything should be provided. (5) Plans should include existing and proposed antenna/equipment schedules in table form on the plans. Tables can be separate or combined into one (1). These tables should include the dimensions, manufacturer, and model number of all existing and proposed antennas and RRUs/RRHs. (6) If WCF components were previously approved but not built, this information should also be included in project descriptions and equipment schedules. (7) Projects submitted by a site management company should disclose the carrier(s) on the site, and project submitted by a carrier should disclose the site management company. If Company A manages the site, and Carrier B is their tenant, plans submitted by Company A should say Carrier B is the tenant, and plans submitted by Carrier B should state that the site is managed by Company A. (d) Annual site listing. To the extent required by city ordinance, WCF providers shall submit site listings to the city. For the purposes of implementation, "WCF Provider" includes both wireless carriers and telecom site management companies. Therefore, sites may be on more than one (1) list. This documentation should include any site that provides commercial personal wireless services and/or information services, regardless of the size, location, or the technology used. This means that both macro sites and small cell WCFs (SC-WCFs) should be listed. The following should be included in this site listing. (1) Site name: The name by which the provider refers to the site. (2) Site address: The address assigned to the site and/or used in applications. If there is no address, do not approximate. Staff will rely on geographic coordinates. (3) Geographic coordinates: The latitude and longitude of the site in decimal degrees to the eighth decimal place. Please do not submit coordinates in degrees/minutes/seconds (32°43'09.7"N 117°08'18.0"W); these coordinates may be used to track/map sites and decimal degrees (32.719370, -117.138327) are required. (4) Site number: Typically in a format such as SD0338X or 805974. (5) Wireless providers only: If your site is owned by another entity such as Crown Castle, SBA, American Tower, Mobilitie, etc., list the name of that entity. (6) Property/Asset managers only: List each wireless provider at your site. If you give each provider a separate site number, each site number should be a separate line in the list. If multiple carriers share a site number, use one (1) line per carrier. (7) The type of site: Whether the site is a macro site or a small cell WCF (SC-WCF). (8) Form factor: Site category as shown in these guidelines (faux tree, rooftop concealment, façade-mounted, etc.). (e) Properties with existing code violations. WCFs may not be approved on properties with existing code or permit violations unless the violation is remedied by the project. This may include collocated facilities that rely on the permits of others. Depending on the context, code violations may be cleared with the work proposed by the project, or a separate permit may be required. For Spectrum Act projects, all permit violations should be cleared prior to determining if the project is an eligible facilities request. The Spectrum Act cannot be used to bring a site into compliance. (f) Plans should match what is constructed. Staff will not be held responsible for projects that are not constructed per plans and photo simulations. Variance in the field must be brought to staff's attention and reevaluated as soon as possible. Staff understands that projects can sometimes change in the field and will work toward an equitable solution. Telecom inspections are not scheduled using the automated telephone system. Contractors should send high-resolution pictures demonstrating compliance with the conditions and exhibits identified on the approval notes imaged onto construction drawings to the applicable project manager/inspector. Once cleared by the project manager/inspector, the project can call for final inspection.
(Ord. No. 3003, § 2(Exh. A), 6-18-19)
Ask a question about Gulfport law
Corpus searches the Gulfport sections it holds and shows the ones that match, with their citations. Free, no sign-in.
