Sec. 16-179. - Conformity and amendments to approved plans.
(a) The approved EPSC or sketch plan, upon which subsequent permits may be issued by the City of Hernando, shall be adhered to during all grading and construction activities. Under no circumstance is the owner or operator allowed to deviate from the approved EPSC or sketch plan without prior approval of a plan amendment by the director of engineering or his/her designee. (b) The director of engineering or his/her designee shall require the grading permit holder to take corrective actions, which may include amendment of an approved EPSC or sketch plan, if it is determined that the approved plan does not adequately protect against erosion, sedimentation or discharges of other construction related wastes despite the adherence of the owner or operator with approved protective practices. (c) The owner or operator is required to resubmit an EPSC or sketch plan for approval by the director of engineering or his/her designee if site plans or conditions change during land-disturbing activities. (d) Plan amendments must comply with this article and the grading policy manual. (e) Pre-construction inspection and meeting. (1) For all land-disturbing activities greater than 0.10 acres, a grading permit shall be issued only after a pre-construction inspection by the director of engineering or his/her designee indicates that perimeter erosion prevention and sediment control measures have been installed in accordance with the approved plan. (2) Attendance at a pre-construction meeting with the director of engineering or his/her designee prior to issuance of a grading permit is required for owners and operators of developments or redevelopments that are: a. New residential subdivisions; or b. A priority construction activity, as defined in this article. c. Owners and operators of land development activities not listed in section 16-173(18) of this article may be required to attend a pre-construction meeting when coordination with adjacent construction activities is needed or when conditions indicate a higher than normal risk for pollutant discharges.
(Ord. of 10-1-2024, § 9)
Ask a question about Hernando law
Corpus searches the Hernando sections it holds and shows the ones that match, with their citations. Free, no sign-in.