Art. VI — REQUIRED MINIMUM IMPROVEMENTS
Code of Ordinances of the City of Hernando, Mississippi (Supp. No. 13: codified through Ordinance of August 4, 2026) · Hernando Code of Ordinances App. A, art. VI
Corpus is an independent public-information project, not the official City of Hernando website. Stable reference: corpuslaw.us/code/ce46fc95-a16a-4659-a3ce-96e3e7f83794
ARTICLE VI. - REQUIRED MINIMUM IMPROVEMENTS
A. Authority to Proceed with Installation of Improvements. 1. Receipt by the Subdivider of the approval of the Preliminary Plat by the Planning Commission shall constitute authority for the Subdivider to begin preparation of the following minimum improvements and preparation of the Final Plat. The Subdivider shall: a. Submit final construction plans and specifications to the City Engineer through the Office of Planning prior to construction of any of the required improvements or the submission of a performance bond. b. Submit engineering maps showing approximate grades and profiles of streets and plans regarding facilities for storm water drainage and other proposed improvements such as sidewalks, plantings, parks, and any grading of individual lots except when specifically not required by the Planning Commission. 2. If the Engineer shall find such plans and specifications to be in accordance with applicable policies and standards of the Mayor and Board of Aldermen, he shall authorize construction and determine the amount of bond, if required. Following the approval of the plans and specifications, construction may be started or the bond may be filed. 3. All improvements must be inspected during the course of construction of the improvements. A schedule of inspections must be coordinated with the City Engineer. The City Engineer will make written inspection reports during the period of construction. B. Procedures for Posting or Release of Bonds. 1. No Final Plat of any subdivision shall be recorded unless all improvements specified in the approval have been completed or a performance bond has been filed with the Mayor and Board of Aldermen securing the construction of improvements specified in this Article. 2. The Subdivider shall sign an agreement with the Mayor and Board of Aldermen agreeing to install or provide the required improvements and shall file with the Mayor and Board of Aldermen a bond. This agreement and bond shall be conditional to secure the construction of the required improvements listed in this Article in a satisfactory manner and within a period specified by the Mayor and Board of Aldermen, such period not to exceed two (2) years. No such bond shall be accepted unless it is enforceable by or payable to the city of Hernando in a sum at least equal to the amount specified below and in a form with surety and conditions approved by the Attorney for the Mayor and Board of Aldermen, where costs of improvements are not specified, this amount shall be estimated by the City Engineer. 3. The bond amount for streets shall be determined by the City Engineer and shall be a sum at least equal to the amount estimated to construct the required improvements to the required specifications two (2) years from the date of the agreement. 4. All road construction will be guaranteed after acceptance by the City of Hernando subject to normal wear and tear. A maintenance bond in an amount set by the City Engineer will be required in order to assure the satisfactory condition of the required improvements. The maintenance bond shall continue to be in effect until 25% of the lots in that section of the subdivision are built on or one (1) year whichever time is greater. 5. When all of the required improvements have been constructed, the Subdivider shall contact the City Engineer for a final inspection and shall provide certification that the final improvements have been installed according to City specifications. The City Engineer shall inspect the subdivision and make a written report, a copy of which is to be provided to the Subdivider and the Mayor and Board of Aldermen. 6. The bond will be released by order of the Mayor and Board of Aldermen when the subdivision receives an approved final inspection report from the City Engineer. The Mayor and Board of Aldermen on recommendation of the City Engineer may reduce liability on the bond as work progresses and after acceptance may reduce the bond to such amount as the City Engineer deems sufficient to guarantee performance of the warranty. C. Installation of Part of Improvements. The owner of a tract may prepare and secure approval of a Preliminary Plat for the entire tract and the required improvements in only a portion of such tract, but the improvements must be installed or provision made for their installation in any portion of the area for which a Final Plat is approved for recording. This is provided, however, that any gas mains, storm sewers, trunk sewers, and any sewage treatment plants shall be designed and built to serve all the area owned by the Subdivider or designed and built in such a manner that they can easily be expanded or extended to serve the entire area and provided further that the requirements of Article V.E.2. have been met. and provided further that the require- D. Survey Monuments. All subdivision boundary corners shall be marked with permanent monuments. A permanent monument shall be deemed to be a four (4) inch by four (4) inch concrete post at least thirty (30) inches long with a one-half (½) inch steel rod center. Should conditions prohibit the placing of monuments on the line, offset marking will be permitted, provided however, that exact offset courses and distances are shown on the subdivision plat. Iron pipes or steel rods shall be set at all lot corners. If survey monuments are removed during construction, they shall be replaced. E. Minimum Standards. The owner shall submit to the City Engineer through the Office of Planning two (2) complete sets of plans and profiles of roadwork to be constructed in the subdivision. The City Engineer may require the owner to lay grades and designate size of drains to be used before considering the same and may make any changes he deems necessary to conform to good engineering practice. The owner will furnish the City Engineer a topographical map of the area to be subdivided when required by him, so that he may be able to study drainage requirements. Contours on the map shall be on two-foot intervals from actual elevation. 1. Street Improvements. All existing and new roads, regardless of lot size must comply with these regulations before dedication is accepted and before the roads will be maintained by City of Hernando. a. Depth of Soil Cement: Residential subdivisions shall have a minimum of six (6) inches of soil cement using minimum of ten (10%) percent cement by volume and three (3) inches of asphalt surface coarse. Commercial and industrial subdivisions shall have a minimum of eight (8) inches of soil cement using minimum of ten (10%) percent cement by volume and three inches of asphalt surface coarse. b. Width of Soil Cement: (1) 50' R.O.W. roads shall have thirty feet (30') of soil cement. (2) 60' R.O.W. roads shall have forty feet (40') of soil cement. (3) All 68' and 80' R.O.W. roads shall have forty-eight feet (48') of soil cement. c. Use of Clay Gravel Base - an alternative road base using compacted clay gravel may be approved. Said base shall have a compacted depth of eight (8) inches for residential subdivisions and twelve (12) inches for commercial and industrial subdivisions. Where needed as an arterial road, the soil cement thickness and width may be increased by the City Engineer. d. Width of Pavement: (1) 50' R.O.W. roads (streets, lanes, drives, etc.) shall have thirty feet (30') of pavement or twenty-four feet (24') when there is no curb and gutter. (2) All major thoroughfares, as determined by the planning commission and/or illustrated on the major thoroughfare plan, shall provide for five-lane road/street cross sections. (3) All other roads (streets, lanes, drives, etc.) shall have pavement widths as specified in the cross sections shown in the table below. Street Type | Min. Pavement Width (in feet) Major or Arterial 4 lanes with median or turn lane, parking | 68 4 lanes with median or turn lane, no parking | 48 4 lanes with no parking | 48 4 lanes with shoulders and ditches (rural) | 48 Collector Commercial, Industrial, and multi-family residential | 44 One and two-family residential areas | 36 Minor/Local | 26 Alley | 16 e. Method of Surface Construction. (1) A developer shall construct streets in the following manner: (a) After completion of soil cement the developer shall apply one and one-half inches (1½") of plant mix surface, using the most recent Mississippi Department of Transportation Specifications, construction bonding may be reduced in accordance with remaining construction as set forth below. (b) After construction of at least 85% of subdivision lots, plant mix surface shall be applied. Plant mix surface shall be applied at one and one-half inches (1½") in thickness, using the most recent Mississippi Department of Transportation Specifications. The Developer's construction of streets shall require certification of compliance with construction standards by an engineer licensed in the State of Mississippi. Certification of construction standards will allow for the reduction of the construction bond to a one-year maintenance bond. (c) The issuance of building permits shall cease for failure to fully comply with the standards herein stated. f. All new roads must be paved by the Developer before being accepted by the Mayor and Board of Aldermen for maintenance. Three inches of plant mix surface, using the latest Mississippi State Highway Specifications is required on all new roads in subdivisions. Any changes from these specifications must be approved by the City Engineer and tests may be required on all materials. The latest edition of Mississippi Department of Transportation Specifications will govern construction. g. All bridges shall be constructed according to the Mississippi Standard Specifications for State Aid Road and Bridge Construction in effect at the time the subdivision is approved. h. The Subdivider shall dedicate and construct all minor and collector streets for full width of right-of-way as defined in Article V.A.5. Where the developer is developing a subdivision that runs to or along the center of a major or arterial street, he will be required to dedicate and develop only one-half (½) of said road. However, in no case shall less than twenty (20) feet of wearing surface be required when one-half (½) of the right-of-way is dedicated. i. Curb and gutter will be installed in all residential, commercial, and industrial zoned subdivisions using the Mississippi State Highway Specifications. The developer shall have material and compression tests of the concrete performed and the results submitted to the Engineer. In residential, industrial, and commercial subdivisions in rural areas, curb and gutter requirements shall be of such character as is suitable for the expected traffic and in harmony with similar improvements in the surrounding area, as determined by the City Engineer. j. The Developer's engineer must notify the City Engineer in writing when the subgrade is ready for soil cement stating all culverts, subgrade width, and firmness of subgrade are up to approved engineering standards before gravel is placed on the road. The Owner shall notify the City Engineer when he plans to place soil cement on the road. The City Engineer may have a representative present if load measurement is to be used. After the soil cement is placed, the City Engineer will again certify that the soil cement is of proper material thickness and width. When the road is to be paved, the City Engineer again will certify as to roadbed being in proper condition for surfacing and that the materials used meet standards. The City Engineer or his representative will inspect the road one time after being notified at completion of each phase of this work at no cost to the owner. If another trip is made, there will be a per hour charge for time involved on all other trips. k. If these standards are not carried out, the City of Hernando Board of Aldermen will not accept the roads for maintenance. F. Drainage. 1. The plat shall be laid out so as to provide proper drainage of the area being subdivided. Drainage improvements shall maintain any natural watercourse and shall prevent the collection of water in any low areas 2. All drainage pipes may be concrete, asphalt coated metal pipes, or plain galvanized-coated metal pipes. The City Engineer must approve the gauge thickness of asphalt-coated metal pipes or plain galvanized metal pipes. All plain galvanized pipes approved by the Engineer for the sizes twenty-one (21) inches through ninety-six (96) inches in diameter shall be one gauge heavier than the approved gauge for asphalt-coated metal pipe. The Developer's Engineer shall provide the City Engineer with the shipping tickets showing the gauge of all pipes installed. 3. The Planning Commission upon recommendation of the City Engineer may require paving of ditches or appropriate stabilization. Sufficient easements will be provided on subdivision plats for maintenance of large ditches for alignment and cleaning. Ditches shall be constructed on uniform grades sufficient for proper run-off. 4. All underground drainage must be inspected and approved by the City Engineer. 5. All driveway culverts and ramps shall be provided for by the Subdivider. The cost of culverts and ramps shall be included within the performance bond for the Subdivider with the number of culverts and cost being approved and estimated by the City Engineer. Upon installation of any culverts or ramps by the Subdivider, the performance bond may be reduced or a new bond substituted to secure the obligation with respect to culvert and ramp requirements. G. Sidewalks. 1. Concrete sidewalks not less than five (5) feet wide and four (4) inches in depth shall be constructed along both sides of streets with curbs and gutters in accordance with applicable standard specifications of the City. 2. The Mayor and Board of Aldermen may waive the above requirement for sidewalks provided that street rights-of-way are left unobstructed and graded in such manner that sidewalks may be constructed at a later date. 3. Material and compression tests of the concrete shall be performed and submitted to the City Engineer. H. Water Supply. All subdivisions shall have the proposed water system approved by the appropriate state agencies. The water system shall have enough outlets and shall be large enough to furnish an adequate water supply and fire protection to every lot. 1. Water mains, where possible, shall be located in street rights-of-way as approved by the City Engineer. 2. The installation of the water system, including fire hydrants, shall be subject to the approval of the Mayor and Board of Aldermen and City Engineer. 3. Fire hydrants shall be installed in all sub division except where the water system serving that subdivision is not adequate. The hydrants shall be located not more than five hundred (500) feet as measured along a dedicated street from all lots within the subdivision. All fire hydrants will be served by a six (6) or larger I. Sanitary Sewer System. 1. Centralized sewage collection and treatment facilities shall be provided on all lots in all subdivisions except as hereafter provided, and shall conform to all applicable state and local laws. 2. Where centralized public sewage collection systems are not reasonably accessible to the Subdivider and an individual centralized disposal system is provided by the Subdivider, sewer lines shall be laid out so a future connection with the public sewer main shall be made. All plans shall be designed and approved in accordance with the rules, regulations, and standards of the Mississippi State Board of Health. Necessary action shall be taken by the Subdivider to extend or create a sanitary sewer district which will maintain the disposal system. 3. Individual septic tanks may be used in subdivisions where central sewage is not available only if written approval is obtained from the Mississippi State Board of Health. 4. All subdivisions hereafter filed for record in the Office of the Chancery Clerk shall be approved only for use with central collection and treatment of sewage unless there is affixed to the plat a notation signed on behalf of the Health Department that septic tanks may be used on the lots. Developers contemplating use of central collection and treatment need not submit such plats to the Health Department but all approvals by the City will only authorize centralized collection and treatment and no building permit will be issued authorizing use of septic tanks on such lots. Notations authorizing use of septic tanks by the Health Department may be in substantially this form: "SEPTIC TANKS MAY BE USED ON THE LOTS SHOWN ON THIS PLAT OF SUBDIVISION" DESOTO COUNTY HEALTH DEPARTMENT By: _____ HEALTH OFFICER J. Street Lights and Traffic Signs. Streetlights and traffic signs shall be required in accordance with design and specification standards approved by the City Engineer and utility company. Where Streetlights are required, the Subdivider shall submit to the City Engineer through the Office of Planning a street light layout design plan. Upon approval, the City will submit a request to the utility company for light pole installation. K. "Street signs shall be installed at all intersections within and bordering the subdivision in accordance with City of Hernando specifications as shown below:" 1. All street designation signs shall utilize 6" .080-gauge flat aluminum 24" in length or larger (in 6" increments). Depending on space needed sign not to exceed 48" in length. 2. The 11" blades have 6" series "B" letters with an upper/lower case format and 4" subscript. 6" blades have 4" series "B" letters with an upper/lower case format and 2" subscript. 3. The sign reflective sheeting shall be 3M series 3900 High Intensity Prismatic sheeting (HIP) and processed colors, inks, or electronic cuttable film shall be matched component system. Background shall be black with white legend. 4. A sign proof sheet which includes all signs and dimensions shall be sent to the engineer for approval. No signs shall be made prior to approval. 5. Center all wording vertically and horizontally on sign. 6. Contractor to verify post/anchor specifications per the Mississippi DOT regulations and specifications. 7. 6" Street Name Blades shall be installed on galvanized u-channel with double-sided street signage placed in intersecting sign brackets. Vandal-proof hardware shall be used to secure signage. 8. The Motif Hanging Sign shall be installed on black powder-coated signposts. Vandal-proof hardware shall be used to secure signage. [image omitted; see the official code] L. Care of Area During Construction. 1. Builders and Contractors shall be responsible for cleaning up all loose paper and material subject to be scattered by the wind each day and prevent such material from scattering through a subdivision or to adjoining property. The premises will be kept in a reasonably clear unlittered manner. Building permits may be withheld from Builders and Contractors who fail to maintain the premises free of litter and loose paper after being warned by the Building Department. 2. Builders and Contractors shall not permit waste materials, dirt, and debris to be placed or allowed to remain in a public street or road. Surplus dirt shall not be graded or pushed into a street. If a Builder or Contractor shall not immediately remove such material placed by him or his Subcontractors in a street after being warned, no building permit shall be issued to him for a period of six months thereafter, and the violator may be prosecuted for unlawfully placing an obstruction in a public road. At the discretion of the Building official, he may cause such material to be removed and the Contractor shall be required to pay the cost of such removal. 3. Every construction site shall have access to an onsite waste receptacle and a portable latrine. Said facilities shall be placed and maintained on the site of construction and shall not pose any nuisance to adjoining properties. M. Erosion and Sediment Control. Installation of the above improvements shall be done in such a manner as to provide for the most effective control of erosion and sediment. The construction plan shall be accompanied by an erosion and sediment control plan which shall be submitted to the Mississippi Department of Environmental Quality (MDEQ) for review and permitting. Copies of the MDEQ approvals and permits shall be submitted to the City Engineer through the Office of Planning prior to beginning construction. Practical combination of the following technical principles shall be used: 1. The smallest practical area of land shall be exposed at any one time during development. 2. When land is exposed during development, the exposure shall be kept to the shortest practical period of time. 3. Temporary vegetation or mulching shall be used to protect critical areas exposed during development. 4. Sediment basins (debris basins, desilting basins, or silt traps) shall be installed and maintained to remove sediment from runoff waters of land undergoing development. 5. Provisions shall be made to effectively accommodate the runoff caused by changed soil conditions during and after development. 6. Permanent final vegetation and structures shall be installed as soon as practical in the development 7. The development plan shall be fitted to the topography and soils so as to create the least possible erosion. 8. Whenever feasible, natural vegetation shall be retained and protected.
(Ord. of 4-18-2023, eff. 5-18-2023)
Ask a question about Hernando law
Corpus searches the Hernando sections it holds and shows the ones that match, with their citations. Free, no sign-in.