For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16-96 — Protection of Water Supply

Code of Ordinances, City of Laurel, Mississippi (complete code PDF dated 11-19-2026) · Laurel Code § 16-96

Corpus is an independent public-information project, not the official City of Laurel website. Stable reference: corpuslaw.us/code/206d5868-22ef-42e4-ba7a-2f51a83a3ac2

Section 16-96. Protection of Water Supply.

In order to protect the City water supply, a permittee under this Chapter shall comply with the following requirements: Prior to any of the following operations, a member of the inspection team must be present at the job site to verify compliance to the requirements stated below: (1) A minimum of twenty-two hundred (2,200) feet of new or equivalent surface casing shall be set. The minimum weight of such casing shall be thirty-six (36) pounds per linear foot and a minimum grade of K/J-55 with a minimum outside casing diameter of nine and five-eighths (9-5/8) inches. In the event the operator of a well desires to drill a hole of smaller diameter than that required for the setting nine and five eighths (9-5/8) surface casing, then and in that event, he may substitute surface casing of a smaller outside diameter if so authorized by the inspection team after said inspection team is satisfied that the casing substituted will be of design specification, relative tension, collapse and burst to conform with similar specifications required in this paragraph, under the nine and five-eighths (9-5/8) casing design. (2) A minimum of one (1) centralizer per two hundred (200) feet of surface casing shall be used. (3) Enough cement shall be used behind the surface casing to circulate back to the surface. (Circulate to the surface shall mean the calculated amount of cement necessary to fill the theoretical annular space plus eighty percent (80%). A minimum of a twelve and one-quarter (12¼) inch bit is required for a nine and five- eighths (9-5/8) inch casing. If the cement is not circulated back to the surface, the top one hundred and twenty (120) feet shall be displaced by washing out through a one (1) inch pipe and replaced with neat cement (Topping out). (4) Surface casing shall be tested in accordance with the State Oil and Gas Manual. No surface casing may be pulled from the well. (5) No surface casing may be perforated for water production. (6) The permittee shall comply with abandonment and plugging provisions of Section 17-103 of this Chapter and the salt water disposal provisions of Section 16-97.

Source: Ordinance No. 1131-1988, 8-16-88

Ask a question about Laurel law

Corpus searches the Laurel sections it holds and shows the ones that match, with their citations. Free, no sign-in.