§ 23-64 — Installation Requirements
Code of Ordinances, City of Laurel, Mississippi (complete code PDF dated 11-19-2026) · Laurel Code § 23-64
Corpus is an independent public-information project, not the official City of Laurel website. Stable reference: corpuslaw.us/code/0db90cb5-4752-43ef-a3b1-6f948569da4f
SECTION 23-64 Installation Requirements
Applicant is responsible for installation, maintenance, operation and ownership of permitted facilities. No trees or shrubs on the City’s right-of-way will be cut, trimmed or damaged during the construction or maintenance of this work or facility, except as expressly shown on approved plans or unless approved by the Public Works Director in unforeseen circumstances. The applicant must maintain 3-foot minimum cover over all piping. All handheld boxes shall be set level and flush with surrounding surface or ground so as not to create a tripping hazard, create ponding or inhibit water runoff. The applicant is responsible for any conflicts with city-owned utilities and must maintain a minimum 10-foot horizontal and 18-inch vertical separation buffer from all sanitary sewer and storm drainage structures. Applicant must maintain a minimum 5-foot horizontal and 18-inch vertical separation buffer from all city-owned water lines and appurtenances, fiber optic, power lines or any other city owned infrastructure. The issuance of this permit in no way constitutes a confirmation from the City of Laurel that utilities and said rights-of-way indicated on documents submitted with this application are true, complete and correct. The applicant is responsible for any conflicts with other utilities on the city right-of-way and is to secure permission from said utilities for conflicts and/or necessary alterations. The applicant is responsible for complete repair of any damage that occurs to the city owned infrastructure as a result of the permitted work. The applicant accepts the responsibility of the safety of the traveling public and his/her workers and agrees to furnish, place and maintain traffic control devices, if required, in accordance with Part 6 of the Manual On Uniform Traffic Control Devices for Highways and Streets (MUTCD), Current Edition at a minimum. The applicant shall submit a special traffic control plan if special traffic control details or detours are warranted. Applicant shall comply with all state, local, Mississippi Department of Health and Mississippi Department of Environmental Quality regulations including but not limited to the Field Manual for Erosion and Sediment Control. The applicant is responsible for all notifications to Mississippi One Call.
Ask a question about Laurel law
Corpus searches the Laurel sections it holds and shows the ones that match, with their citations. Free, no sign-in.